Audio By Carbonatix
Just read the press statement issued by the GNPC on the Purchase of the Global Haulage Company (GHCL) property. A few points need to be made and some answers also needed.
1. GNPC has rented A Global Haulage property currently as their Foundation Building in Takoradi. This is different from the property the Corporation has bought from the same Global Haulage Company Limited. So let's not confuse the two. What at all is unique about the properties of this company where interestingly the MD of GNPC worked for.
2. GNPC in their statement said the total amount paid for the property was 7.5 million dollars. Perusing the memo and the Payment Authorisation Voucher making the rounds it is realised that, if u take out the deducted withholding tax of 3%, the amount paid was 7.275 million on the 29th of December 2017. And not 3 million. another 2milion to be paid 3rd of January 2018. So the total cost is 9.5 million dollars.
3. The statement claimed that the Board of Directors set up a committee comprising some of its members and management to identify and negotiate the Purchase of a suitable property.
QUESTION: Who are the members of this committee?
4. The statement further stated that the property offered by GHCL was selected for purchase after reviewing other offers.
QUESTION: can GNPC tell us which other offers were reviewed.
5. If we look at the Payment Authorisation Voucher, the description of the property is 6 residential units and not 18. If we assume that the 7.5 million dollar figure given by GNPC is right and using the current exchange rate of 4.8 Ghana Cedis to a dollar, it means the property will cost 36 million Ghana cedis. Therefore each unit which is made up of 2/3 bedrooms will cost 6 million Ghana cedis. Which 2 or 3 bedroom property even in the most posh area in Accra will cost 6 million not to talk of Takoradi
6. GNPC also indicates that 2 evaluations were done by AESL and Nana Kumi and Associates.
QUESTION: in the spirit of transparency and because this issue has a huge public interest, can these reports be made public?
7. The issue of Conflict of Interest becomes even more evident considering that since Dr. K.k Sarpong became the MD of GNPC, the Corporation has engaged GHCL for 2 of their properties at different times.
8. GNPC has a Housing project in Takoradi known as the Beach Road Project. This is a 13 million dollar project and it is about 85% complete. The corporation needs another 1.2 million dollars to complete. Why did K.K. Sarpong and GNPC decide to purchase another project for 9.5 million dollars which will need an additional 4 million cedis to renovate?
I think this case is far from over.
Latest Stories
-
Four suspects arrested in fatal kidnapping attempt near Chereponi
21 minutes -
Sankofa Pan-African Committee honours Temple of Rabbi leader as ‘Custodian of Peace’
25 minutes -
Obuasi Trade Show records high turn-out and strong impact
40 minutes -
‘Obroni wawu’ – The paradise of waste: Where Charity becomes a curse
55 minutes -
38 arrested in intelligence-led police operations across parts of Tema Region
1 hour -
Experts say missing engine part in most Ghanaian vehicles polluting air, sickening people
2 hours -
India express train kills seven elephants crossing tracks
2 hours -
Gunmen kill nine in South Africa tavern attack
2 hours -
Charting a New Course for National Prosperity: Why an open ship registry can anchor Ghana’s twenty-four-hour economy vision
3 hours -
Ghana Airways restoration key to national pride and economic reset – Ablakwa Â
3 hours -
US seizes second oil tanker off Venezuela’s coast
3 hours -
Australian PM announces intelligence review as country mourns Bondi attack
3 hours -
Imran Khan and wife given further jail terms after state gift fraud case
3 hours -
5 perish in fatal collision on Cape Coast–Takoradi Highway
4 hours -
Poultry imports driving egg glut – GAPFA
4 hours
