
Audio By Carbonatix
The residents of Adamorobe in the Eastern Region have expressed frustration over the government's failure to construct their road.
The road, which serves as a link between Oyibi and Aburi towns, is in a deplorable state.
According to the residents, their woes have been exacerbated by the label of being a deaf village, which has significantly hindered their development.
They emphasised that they are relying on divine intervention to survive because they lack critical infrastructure such as roads, clinics, and potable drinking water.
Speaking to JoyNews’ Adobea Asare, the Chief of Family Heads in the town, Abusuapanyin Yaw Asare, stated, “Our major challenge with our town is our main road, which connects from Oyibi to Aburi. The government has been promising to construct it for years but to no avail.”

Nana Edward Acquah, a sub-chief of the town, also stated if someone wants to help the town, they should first consider constructing their road.
"This is a major road that connects two big towns and can serve as a good shortcut for travellers moving from Tema to Koforidua,” he said.

Kwame, a driver and station master in the town, lamented how the poor road network is affecting him and other drivers in the town.
“I’m the GPRTU station master for this town - we have spoken severely about this poor condition of our road. Certain people who had to be rushed to the hospital for immediate healthcare lost their lives due to the poor state of the road.

"The state of the road even affects us drivers, and we spend lots of money fixing the problems the road causes our vehicles. We plead with the responsible body to help fix our road,” he stressed.
Some of the residents also shared their frustration due to the bad road conditions.

“I have lived in this town for quite some time, but I can say that the major problem we have here is our road. The dust from the road is too much for us. We are also electorates who vote,” Elizabeth Acheampong said.
Another resident, Matilda Amaki, remarked, “We only have one appeal, and that is the construction of our road; the dust is too much.”

The people of Adamorobe want the government to give them a fair share of developmental projects by constructing their road.
Latest Stories
-
US military identifies two soldiers killed in Iranian attack in Jordan
2 minutes -
Police arrest 6 suspected robbers, recover GH¢300k stolen at Portor-Gurumpe highway
9 minutes -
Fire destroys 4 shops near Bolgatanga Main Station
14 minutes -
Assembly man, brother remanded over death of 25-year-old driver at New Edubiase
34 minutes -
CID arrests 11 in Tema cybercrime operation as two ‘trafficking victims’ become suspects
36 minutes -
Wontumi’s last words to me were ‘work hard, bring NPP back to power’ – Palgrave Boakye-Danquah
37 minutes -
‘Abrogate the contract, refund deducted funds’ – Sulemana Braimah tells NASPA
1 hour -
NASPA clarifies GH¢60 deduction, says fee was meant to be GH¢15 monthly
1 hour -
Flux Power & Automation launches smart energy management system to help Ghanaian businesses cut electricity costs
1 hour -
Consortium in talks to buy Liverpool minority stake
1 hour -
NASPA suspends capacity building programme after concerns over allowance deductions
1 hour -
Global drug threats emerging rapidly through technology – NACOC D-G
1 hour -
Wontumi conviction: History has been made; political protection for illegal miners over – Inusah Fuseini
1 hour -
No sirens or police escorts without approval, Speaker Bagbin tells MPs
1 hour -
Challenging Heights selected for FIFA Global Citizen Education Fund to support child trafficking survivors
2 hours