Audio By Carbonatix
Formula 1's summer break has been moved forward from August as a result of the coronavirus pandemic.
The new season has been thrown into disarray by the virus and F1 is working on plans to run as long a season as possible once races can be held.
Following unanimous agreement, the 'break' will be held in March and April, with teams choosing a three-week period in that time to close.
It is normally held in August, when teams shut down for two weeks.
The change, made to facilitate fitting in as many races as possible once the season starts, was approved by governing body the FIA's legislative body, the World Motor Sport Council, on Wednesday.
Further changes are expected in due course. Teams and F1 bosses are working on plans for a reshaped calendar with a reduced number of races from the 22 originally scheduled in 2020.
The four opening races in Australia, Bahrain, Vietnam and China have all been postponed, and the three next events in the Netherlands, Spain and Monaco are expected to follow in the coming days.
Red Bull said in a statement that they were planning to shut down for three weeks from 27 March but "there may be some flexibility around those dates due to the ever-changing nature of the pandemic".
The former champions said they "agreed with the measures being taken to reduce the risk of transmission and will support any further race postponements that are deemed necessary".
They said they were "taking every possible precaution to mitigate the spread of the virus" and were "implementing special working methods, guided by the UK government and medical professionals".
F1 bosses are currently working on a plan to start the season with the Azerbaijan Grand Prix on 7 June but that is dependent on the development of the coronavirus outbreak and related global travel restrictions.
A number of races have been identified as the most likely to be left off a truncated scheduled, with Monaco, Brazil, Spain, China and Australia at the top of the list.
Teams are trying to secure the required unanimous agreement on a plan to delay until 2022 the introduction of major regulations changes which are scheduled for next season.
Nine of the 10 teams agreed to the proposal at a meeting on Tuesday, with only Ferrari asking for more time to consider it.
The idea behind the plan is to keep costs under control at a time when teams are facing reduced revenue as a result of the expected lower number of races.
A further meeting is scheduled for Thursday to discuss the matter again.
Latest Stories
-
YEA records GH¢110.4m surplus after turning around 2024 deficit – SIGA report
2 minutes -
Madina MP Francis-Xavier Sosu prioritises road rehabilitation, education and healthcare
7 minutes -
Valco-Kpone road turns nightmare as motorists fume, tanker drivers threaten fresh strike
7 minutes -
STC cuts net loss by 93% to GH¢5.18m despite 12% revenue decline
15 minutes -
Tanker drivers threaten strike over deplorable VALCO-TOR-Kpone road
20 minutes -
NPA surplus jumps 76% to GH¢447m in 2025 – SIGA
23 minutes -
Railway workers push for completion of Takoradi-Nsuta line by 2027
27 minutes -
Police arrest 6 suspected notorious armed robbers in Kumasi
30 minutes -
Opinion: GHS1m is welcome, but Ghana Premier League’s biggest problem remains unsolved
32 minutes -
Stylen Boy’s ‘Adole’ featuring Kurl Songx hits No. 1 on Ghana iTunes
34 minutes -
CBG’s assets rise to GH¢17.86bn as deposits, revenue and equity grow in 2025 – SIGA Report
38 minutes -
KNUST SHS considers slashing admissions over infrastructure deficit
42 minutes -
GEXIM Bank’s capital adequacy ratio rises to 75.3% in 2025 – SIGA Report
46 minutes -
CPC’s revenue plunges 47% as net loss widens to GH¢144m — SIGA
46 minutes -
Ghana Water turns GH¢3.06bn loss into GH¢635.23m profit in 2025 – SIGA Report
47 minutes