Audio By Carbonatix
The Ghana Grid Company (GRIDCo) has announced a planned power outage in parts of Weija, Kasoa, and nearby communities on Sunday, 25 May, to enable critical maintenance at the Kasoa Bulk Supply Point.
The exercise, scheduled between 9:00 a.m. and 4:00 p.m., is aimed at enhancing power reliability and improving service delivery in the affected areas.
In a statement issued on Thursday, 22 May, GRIDCo listed the communities expected to be affected. These include:
Kpormotey, Kalabule, Adaakope, Amuzu Kope, Amanfrom, Denchira, Ashalaja, Adam Nana, Nurses Quarters, Kwame Anum, Kuwait, Lamgma, Fulani, Mama Africa, Broadcasting, and surrounding areas.
The Electricity Company of Ghana (ECG), in an accompanying message, apologised for the inconvenience the planned works may cause.
“ECG regrets the inconvenience that will arise out of this exercise,” the statement read.
GRIDCo has encouraged residents in the affected communities to plan accordingly, assuring that the scheduled maintenance is vital to ensuring a more stable and efficient power supply in the long term.

Latest Stories
-
Rethinking intelligence in the age of Artificial Intelligence
11 minutes -
‘Every day is about survival’ – Workers demand action beyond May Day celebrations
11 minutes -
Clear leadership demonstrated in managing recent power crisis – Dr Theo Acheampong
14 minutes -
Accountability is defective in the energy sector – Ben Boakye
16 minutes -
From detection to creation: Why education must move beyond AI plagiarism
17 minutes -
Ghanaians keep paying for inefficiencies in the power sector – Prof Bokpin
17 minutes -
Ghana’s power system not robust, outages inevitable – Ben Boakye
18 minutes -
Beyond insults: The I.D.E.M playbook for political parties in the age of the ‘social media minister’
22 minutes -
Germany backs Moroccan sovereignty in Sahara dispute
41 minutes -
Beyond Competence: How capacity shapes professional access and influence
41 minutes -
Chamber of Mines calls on BoG to release full breakdown of mining export proceeds
50 minutes -
We appeal to Ghanaians for patience as we replace more transformers – Energy Minister
1 hour -
Power stability has improved since 2025 compared to 2024 – Jinapor
1 hour -
Akosombo substation fire should never have happened – Ben Boakye
1 hour -
Savannah region: Yazori Chief issues election boycott threat over underdevelopment concerns
1 hour