Audio By Carbonatix
The Chief Executive Officer of the Ghana Railways Development Authority, Dr Frederick Appoh, has dispelled reports that the non-operational status of the Tema–Impakadan railway line is due to a lack of fuel to power the trains, clarifying that the issue lies with infrastructural challenges rather than logistics.
Some workers at the Ghana Railway Company, who have declared a strike, explained that the two trains on the Tema–Impakadan route are non-operational due to a fuel shortage.
Speaking on JoyNews’ The Pulse show on Wednesday, May 14, Dr Appoh stressed that both trains on the route are in excellent condition and ready for service.
“Tema–Impakadan remains one of the key infrastructure assets of the country. The two trains are operable, in good condition, and ready to go,” he said. “The fact that the trains are not working has nothing to do with fuel shortages.”
Dr Appoh explained that a track inspection carried out on March 15 uncovered significant issues along the railway corridor.
These included illegal encroachment, widespread theft of materials, and vandalism of critical components.
“We encountered a lot of issues,” he noted. “Buffer stock was almost non-existent — taken off by scrap dealers. Most of the nuts and screws had been illegally removed from the tracks. We are in the process of rectifying all these issues.”
The Railways CEO revealed that the Ghana Investment Fund for Electronic Communications (GIFEC) is spearheading mitigation efforts, and that considerable progress has already been made.
“At the moment, I can confidently say that 75% of the ongoing GIFEC mitigation action plan is almost complete,” he said.
Dr Appoh acknowledged the ongoing salary crisis affecting staff at the Ghana Railway Company Services (GRCS).
“The issue of non-payment of salaries over seven months is deeply concerning, and we acknowledge the genuine hardship this has caused GRCS staff,” he stated.
He assured workers that the Ministry of Transport, under the leadership of Joseph Bukari Nikpe, is actively working to resolve the delay.
“I’m very much aware of the steps being taken by the Minister to address this issue,” Dr Appoh added.
Latest Stories
-
NPP must aim for decisive 2028 parliamentary Majority — Minority Leader
22 minutes -
Ghana not afraid of Germany like a few years ago – Kurt Okraku
27 minutes -
UNESCO-Ghana, Manhyia Palace Museum seal partnership as 2026 Otumfuo Art Awards launched
51 minutes -
Ibrahim Mahama faces Police board as assault probe continues
60 minutes -
UK–Ghana study tour strengthens partnership on roads and future transport systems
1 hour -
Renting out your Accra apartment: Should you short-let or long-let in 2026?
1 hour -
Government communication alone won’t fix tomato shortage – Dr Charles Nyaaba
1 hour -
Ghanaian community in Switzerland champions inclusive governance at Diaspora Dialogue Series
2 hours -
UN slavery resolution isn’t binding, but revives calls for reparations – Prof Appiagyei-Atua
2 hours -
Ablakwa expresses deep gratitude to UN member states for backing Ghana’s slavery resolution
2 hours -
Gender Minister engages management, introduces new Chief Director at MoGCSP
2 hours -
Last Gallop: The rise, fall and fight for Horse Racing in Ghana
2 hours -
Communications Minister launches Ghana Climate Atlas to strengthen planning and climate resilience
2 hours -
Maintain credibility, reduce commentary — NDC elections director advises Mussa Dankwah
2 hours -
NDPC urges time discipline and stronger systems to accelerate Ghana’s development
2 hours
