Audio By Carbonatix
Shenzhen Energy Group (SEG), the mother Company of Sonon-Asogli, an Independent Power Producer in the power sub-sector has proposed to build a 700MW coal-fired power plant in Ghana.
The project which will take 24-30 months to complete will also include the construction of a coal port with approximately 50,000 tons berth.
A Director at Shenzhen Energy Group, Mr. Hong Can disclosed this when he paid a courtesy call on the Minister for Energy and Petroleum Emmanuel Armah–Kofi Buah at the Ministry. The visit was also to brief the Minister and his team on proposed projects the group intends executing in Ghana.
The project is expected to cost about 700M dollars and will need two million tons of coal per year to run when completed which, according to Mr. Can will be imported from South Africa.
SEG also stated that desulfurization and electrostatic precipitator devices and technologies will be employed to increase the efficiency of the plant and minimize environmental pollution to the barest minimum.
SEG, who already operate different thermal plants of a total installed generation capacity of 8106MW with coal-fired plants constituting about 3700MW have decided to embark on this project because coal as a fuel is cheap, abundant, widely used, efficient, safe and that there are modern technologies to minimize environmental pollution.
The Minister on his part thanked Shenzhen Energy Group for their continuous interest in Ghana energy sector and welcomed the current proposal.
He indicated that Ghana has a target of increasing its current installed generation capacity of about 2,500MW to 5000MW by 2016 and the proposal of SEG with a vast experience in building and operating power plants could not have come at a better time.
The Minister also indicated that the proposed project looks exciting especially as it will be fired by coal which is a cheaper fuel compared to gas and light crude oil. This in his opinion will translate to cheaper energy cost for both industries and households.
The Minster therefore pledged the Ministry’s support for the project and requested SEG to present a roadmap of the project to the Ministry as soon as possible, highlighting the role Government can play to bring the project to fruition.
The Minister who was present with his two deputies, Hon Ben Dagadu and Hon John Jinapor also had the Chief Director, Prof, Thomas Akabzaa and Ag Director of Power Mr. Emmanuel Osafo in attendance.
TheShenzhen Energy Group was represented by Togbe Afede, Minghong Ding, Hong Can, Viangzhi Zoo and Xiaoha Li, the Chairman of Asogli power plant.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Gov’t backs 300-seat Parliament with reserved representation for women, youth, PWDs under proposed constitutional reforms
3 minutes -
Gov’t supports moving presidential elections to November under constitutional reforms
8 minutes -
Dual citizens may contest Parliament without renouncing foreign citizenship under proposed reforms
12 minutes -
Government’s response to Constitutional Review report is not a white paper – Ayine
16 minutes -
NPP describes Tamakloe acquittal as “travesty of justice,” demands Wontumi discharge
19 minutes -
Government proposes 35-year minimum age for presidential candidates, rejects CRC’s 30 years recommendation
21 minutes -
Government backs five-year presidential and parliamentary term proposal
24 minutes -
Think before you type: Respect must extend online
27 minutes -
Ghana records GH¢148.3bn trade surplus in 2025 as gold dominates exports
35 minutes -
Ghana’s second Independence moment: Why citizens must engage in constitutional reform
35 minutes -
Sex begins in the mind, not the bedroom – Dr Charity Twumasi Ankrah
37 minutes -
Dr Ibn Chambas advocates education reform to produce innovators and ethical leaders
41 minutes -
Hubtel leadership visits Amazon global headquarters to advance AI and data strategy
45 minutes -
World Bank says Ghana needs US$37 billion yearly for infrastructure as urban population grows
60 minutes -
NPP to announce next steps after Sedina Tamakloe-Attionu acquittal
1 hour