Audio By Carbonatix
The Municipal Chief Executive (MCE) for Ketu South, Maxwell Lugudor has announced the construction of temporary structures along the coast for residents who were affected by the tidal waves that hit the area.
The move, according to Mr Lugudor, is to enable residents have places to lay their heads if the high waves strike instead of being left homeless after the disaster.
Mr Lugudor noted that the red cross is liaising with the Ketu South Assembly to erect temporary tents, housing units for residents and their families while they wait for the permanent housing units.
He revealed that the construction of the permanent housing unit would begin this month.
The MCE made this known when he visited Agavedzi where the tents are being erected for the affected residents.
According to Mr Lugudor, he had to lobby for the temporary solution when he realised that it is needed to ease accommodation challenges.
"As you can see, the materials are here for the start of the temporary accommodation which would prevent people from being homeless after any disaster that may occur," Mr Lugudor said.
"They promised to give us 50 of the tents, so we want to put those things down in case tomorrow something happens. This way, at least people can have a place to lay their heads."
According to Mr Lugudor, the structures are designed to be a concrete foundation with a tent to cover it from widow level to the roofing stage.
Mr Lugudor noted that it became very necessary to have a temporary remedy while they speed up works on some 15-unit permanent housing projects situated on an island at about 6 kilometres away from the sea.
With the permanent housing units, Mr Lugudor noted that the contractor has started the extension of water and electricity to the site, adding that moulding of 1000 blocks daily will also start this week .
The Municipal Engineer, Kingsley Oduro, said his outfit have conducted the feasibility studies on the island and have advised the contractor on what to do due the nature of soil there.
"We have done feasibility studies very well and we know the type of soil on the site, hence the contractor is advised to establish the right foundation in order not to affect the facilities when completed" Mr Oduro said.
The 15-unit apartment is sponsored by Ghana Gas Company, the MCE appealed to other state and private entities to support by building more for the victims.
Residents are happy about the news of a temporary solution, but have urged government to consider the construction of the sea defence wall to prevent the sea from destroying the communities.
Between July last year and March this year, more than 4,000 residents have been displaced by the waves in Keta, Anloga and Ketu South.
Latest Stories
-
A source of excellence across generations – Vice President Opoku-Agyemang lauds Mfantsipim
35 minutes -
(Photos) Mfantsipim School launches historic 150th anniversary
58 minutes -
Knights and Ladies of Marshall group backs Catholic Bishops’ stance on anti-LGBTQ+
2 hours -
Bright Simons writes: All the Filla in the Ibrahim Mahama/E&P – Gold Fields Saga
2 hours -
Monetise Idiocy In Ghana
2 hours -
The Ghanaian prophet and the mysterious death of his scottish wife Charmain Speirs
3 hours -
Nearly 400 sentenced in Nigeria for links to militant Islamists
4 hours -
Ghana’s recovery supported by gold strength despite global oil price pressures – Standard Bank Research
4 hours -
Methodist Church hails Mfantsipim@150; calls for “fresh consecration” to excellence
4 hours -
‘Excellence is our inheritance’ – Nana Sam Brew-Butler hails Mfantsipim’s 150-year reign in leadership
4 hours -
Kwaku Azar writes: A-G vs OSP
4 hours -
Mfantsipim–Adisadel rivalry built excellence, not division – Sam Jonah
5 hours -
Vice President launches Mfantsipim’s 150 years of shaping Ghana’s greatest mind
5 hours -
I assure Otumfuo, Mahama will join him to commission KNUST Teaching Hospital by end of this year – Haruna Iddrisu
6 hours -
Barcelona dominate derby to extend La Liga lead
6 hours