Audio By Carbonatix
Kenya has exported its first batch of oil as President Uhuru Kenyatta flagged off the crude shipment from the port of Mombasa on Monday morning.
It is being described as a historic day and an important step on the way to the full exploration and development of oil in the East African nation.
This is an experimental phase to test the country’s crude oil before full production and exportation begins in around 2024.
A brass band formed part of the official ceremony
The country is expected to earn $84m (£69m) over the next two years.
UK-based Chinese company ChemChina UK Ltd won the bid to buy the first batch of 240,000 barrels under the Early Oil Pilot Scheme (EOPS).
Oil bids were received from firms in Asia and Europe, but the joint oil production consortium, led by explorer Tullow Oil, awarded the contract to ChemChina.

It was a red carpet affair with President Uhuru Kenyatta at the centre of the gathered dignitaries
The crude was transported 850km (528 miles) by road from the country’s north-western oil fields in Turkana to Mombasa.
Kenya currently does not have an oil pipeline in place.
A plan to build a joint pipeline with Uganda failed after Kampala opted to partner with Tanzania.
Tullow estimates that Kenya’s fields in Turkana hold up to 560 million barrels of oil and expects to produce up to 100,000 barrels per day from 2022.
A brass band formed part of the official ceremony
The country is expected to earn $84m (£69m) over the next two years.
UK-based Chinese company ChemChina UK Ltd won the bid to buy the first batch of 240,000 barrels under the Early Oil Pilot Scheme (EOPS).
Oil bids were received from firms in Asia and Europe, but the joint oil production consortium, led by explorer Tullow Oil, awarded the contract to ChemChina.
It was a red carpet affair with President Uhuru Kenyatta at the centre of the gathered dignitaries
The crude was transported 850km (528 miles) by road from the country’s north-western oil fields in Turkana to Mombasa.
Kenya currently does not have an oil pipeline in place.
A plan to build a joint pipeline with Uganda failed after Kampala opted to partner with Tanzania.
Tullow estimates that Kenya’s fields in Turkana hold up to 560 million barrels of oil and expects to produce up to 100,000 barrels per day from 2022.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
ECG procurement is where politicians ‘milk’ the company – Ben Boakye
9 minutes -
IPPs’ contractual arrangements partly to blame for energy sector problems – TUC’s Dr Otoo
21 minutes -
Like Benzema & as good as Haaland – Alonso on Joao Pedro
24 minutes -
Check out 41 countries Ghanaians can visit without a visa on ordinary passports
34 minutes -
I disrupted pre-season travel plans to prepare players – Arteta
41 minutes -
Richarlison’s move to Vasco da Gama falls through
52 minutes -
Dictator meme shows lack of human awareness – Mbappe
55 minutes -
2030 World Cup: Moroccan official told to stop making 2030 final promise
1 hour -
Mourinho compares Mbappe and Vini Jr to fruit trees after boos
1 hour -
Lewis Hall signs new contract with Newcastle until 2031
1 hour -
Signed instead of Rashford, Gordon is proving worth at Barca
1 hour -
2026 BECE automatic placement rate hits 87.3%, highest since 2021 — CSSPS data
1 hour -
Ghanaian youngster Zayan Omar joins Spanish side Málaga
1 hour -
New Man City signings desperate to win – Dias
2 hours -
Morocco rejects Spain blame game, warns against using kingdom as political pawn
2 hours