Audio By Carbonatix
Independent Power Producer, Sunon Asogli Power Limited has been shortlisted among five companies by the Cameroonian government to bid for the construction of 350 megawatts of electricity plant in the Central African country.
In a communique from the Ministry of Energy and Water sighted by Joy Business, the shortlisted companies had obtained scores of more than 80% to bid for the restricted international tender to select a partner for the design, construction and operation in “Build Operate and Transfer” (BOT) mode of the Limbe gas-fired power plant (350MW) and related power lines.
In actual fact, Sunon Asogli was ranked 1st among the five shortlisted companies, in terms of the quality of documents submitted.
According to the statement, the managers of the shortlisted companies have been invited to contact the cabinet of the Ministry of Energy and Water for further procedure.
“On the other hand companies that have not been selected are requested to collect their bids from the Cabinet of the Minister of Energy and Water within 15 days of the publication of the press release”, the statement pointed out.
The statement added that bids that are not withdrawn after the 15 days period will be destroyed.
Sunon Asogli will bid with the China Energy Engineering Corporation Limited.
Other companies shortlisted are Folder Energy Partners Limited/China Machinery Engineering Corporation, Power Construction Limited of China Limited, ACWA Power and AKSA ENERJI URETIM AS.
Latest Stories
-
EOCO exceeds GH¢200m target, recovers record GH¢337.4m in 2025 – Dominic Ayine
7 minutes -
‘Nite with the Stars’ to shake Kumasi with electrifying music performances on Christmas Day
10 minutes -
KsTU constitutes panel to review GTEC directive, VC qualification petition
20 minutes -
Ghana recovers over $15m from international crypto fraud syndicate – Attorney General
35 minutes -
Ghana to receive 300 new ISUZU buses to boost public transport, deputy transport minister confirms
37 minutes -
AG formally requests extradition of Ofori-Atta, Ernest Akore to face charges
54 minutes -
Ofori-Atta’s return to face justice now in US hands, says Ayine
55 minutes -
Asenso-Boakye backs Accra–Kumasi Expressway but urges caution on the process
57 minutes -
EU leaders face crunch decision on loaning Russia’s frozen cash to Ukraine
1 hour -
JoyBusiness Review 2025: GoldBod a ‘game changer’ for Ghana’s economy – Dalex Finance CEO
1 hour -
JoyBusiness Review 2025: Praise for GoldBod is premature without answers on illegal gold – Tax Consultant
1 hour -
UniMAC, AKUNA sign MoU to deliver hands on industry training for students
1 hour -
‘The Gods Are Not To Blame’ returns in tribute to theatre legend Mawuli Semevo
2 hours -
Ghana’s economy must transition from stability to growth in 2026 – Joe Jackson
2 hours -
Photos: Interior Minister opens Upper West Regional Police Headquarters
2 hours
