Audio By Carbonatix
A Senior Research and Policy Analyst at the Institute for Energy Security (IES), Xatse Derick Emmanuel, has called on government and sector stakeholders to adopt a coordinated and simultaneous approach in addressing Ghana’s recurring power supply challenges, commonly referred to as “dumsor”.
His comments come amid renewed public concern over intermittent electricity supply in parts of the country, with growing calls for sustainable solutions to stabilise the national grid.
Speaking on JoyNews’ The Pulse on Tuesday, April 28, Mr Emmanuel said the causes of power disruptions are multi-dimensional, involving challenges across generation, transmission and distribution, and therefore require a holistic response rather than isolated interventions.
According to him, concentrating efforts on only one segment of the power value chain risks prolonging the crisis and exposing the country to repeated disruptions.
“The causes of dumsor are not only one leg. Sometimes it can be a generation issue, sometimes transmission, sometimes distribution,” he explained.
He noted that current challenges appear to be more closely linked to distribution and grid constraints. However, he cautioned that long-term instability could persist if adequate attention is not given to generation planning.
Mr Emmanuel stressed the need for Ghana to shift from reactive solutions to long-term planning and investment that takes into account rising electricity demand driven by population growth, urbanisation and industrial expansion.
“If anything, let us try to solve the problems simultaneously… so Ghanaians do not wake up again and hear there is dumsor,” he said.
He further argued that planned infrastructure upgrades, including improvements to transmission and the national grid, should not be treated in isolation or delayed, as they form part of an interconnected system.
Mr Emmanuel also highlighted the importance of sustained investment in generation capacity, noting that expanding the electricity supply requires long-term planning and implementation.
“You don’t take a day to get a megawatt of power. It takes years of planning,” he said, adding that future energy demand must be anticipated to prevent recurring shortages.
He also pointed to emerging long-term energy options such as nuclear power, suggesting that diversification of generation sources will be essential to strengthening Ghana’s energy security.
Latest Stories
-
US court rules Meta, other tech firms must face thousands of lawsuits over social media addiction
40 minutes -
Trump Media reports $238m loss as crypto falls
51 minutes -
Minority has opposed Cocoa Bill from the onset – COCOBOD
3 hours -
We should smile at our dogs – a new scientific study reveals why
3 hours -
England set to eliminate hepatitis C
3 hours -
Nvidia gets $500bn from major investors to develop AI infrastructure
4 hours -
At least 132 killed in Colombia’s largest earthquake in years
4 hours -
Trump signs order to limit childhood vaccines and split MMR shots
4 hours -
The lonely Chinese men being conned by fake brides
4 hours -
Minority’s narrative is unfounded – COCOBOD fires back over controversial Cocoa Bill
4 hours -
There’s absolutely nothing wrong with it – COCOBOD defends new Cocoa Bill amid minority attacks
5 hours -
“I’m not sure” – K.T Hammond unsure if OSP has questioned Kwabena Donkor over Berko bribery case
5 hours -
Istanbul trip was standard due diligence for Aksa power deal – K.T. Hammond
5 hours -
Kwabena Donkor never met Asante Berko, demanded or received money – K.T. Hammond
5 hours -
Canada flight cancelled after child refuses to wear seat belt
5 hours