Audio By Carbonatix
The National Democratic Congress (NDC) caucus in Parliament has demanded the abrogation of a new contract between the government and South African firm, Mota – Engil.
The deal is for the expansion of the Accra-Tema Motorway into both a three-lane and two-lane stretches.
But, spokesperson for the NDC Caucus on roads, Kwame Agbodza says the $570 million contract was solely sourced without basis and should be terminated.
“So we are telling the government, stop this process, Article 181 have been ignored,” he said.
According to him, the scope of work in terms of reconstructing the motorway is better if awarded to a Ghanaian to benefit the country.
“The top five Ghanaian road contractors can do this at ease and the benefit will be better for Ghanaians.”
However, a statement from the roads minister indicated that the contract was signed on December 16.

Nonetheless, Mr Agbodza noted funds for the project will be either through taxes or bond therefore maintains it must be solely handled by Ghanaian road contractors to benefit Ghanaians.
“Mota – Engil, since they are not bringing a dime, have no business being part of this at all.”
He hinted: “if they push this and we shall call on a parliamentary probe into this contract.”
Latest Stories
-
I attended Harvard – just not the one you think: Rethinking success, career paths and school labels in Ghana
14 minutes -
2026 World Cup: France friendly is more than preparation for Cote d’Ivoire – Oumar Diakité
17 minutes -
State actors must clarify position on LGBTQ+ bill—ACEPA
29 minutes -
More illegal structures to be demolished after Adenta building collapse – La Nkwantanang MCE
30 minutes -
Arla Foods marks World Milk Day with nutrition drive for 42,000 students in Central Region
43 minutes -
BoG’s reforms on community banking aims to build well-capitalised banks – ARB Apex Bank MD
46 minutes -
Government to establish health posts at all land borders to strengthen Ebola preparedness
49 minutes -
Tetegu residents blame authorities over dredging failure at Densu River amid Weija Dam spillage
49 minutes -
Don’t just query KATH – invest in emergency infrastructure, GMA tells government
55 minutes -
GMA clarifies KATH A&E congestion, says no emergency patients were turned away
1 hour -
Ghana and Jamaica strengthen bilateral relations with new cooperation agreements at third PJCC session
1 hour -
Adenta building collapse: Victim died trying to save her children—Sister recounts
1 hour -
Owner of collapsed Adenta building to be arrested for ignoring stop-work order – La Nkwantanan MCE
1 hour -
Accra floods: We have done things the “wrong way” for over 40 years – GhIE President
1 hour -
Ukraine accused of killing four in occupied Crimea
1 hour