Audio By Carbonatix
Thai veterinarians have operated on a 10-year-old anaconda to remove a large tumour from near its heart.
The snake was anaesthetised for the seven-hour operation, Dr Taweesak Anansiriwattana told BBC Thai's Issariya Praithongyaem.
Doctors at Klongluang Animal Hospital had to cut through the skin and abdominal cavity wall in order to reach the tumour, which weighed 1kg (2lb).
Tissue samples have been sent for tests to determine if the snake has cancer.
The snake weighed about 52kg (114 lbs).

The snake was put on a breathing tube

It was brought to Klongluang Animal Hospital, north of Bangkok, by a private owner
Most of the tumour was removed but a small part remains as it was too close to arteries, vets say.
The snake was brought to the hospital by a private owner.

Doctors had to be careful to avoid arteries, as damaging one could have killed the animal

The snake has now recovered consciousness - but may need to undergo chemotherapy if cancer is detected
Latest Stories
-
Use chiefs to stop disputes from flooding Ghana’s courts – Deputy AG to governing council of ADR
12 minutes -
Four arrested as police bust alleged kidnapping, torture and extortion syndicate
14 minutes -
NPA increases price floor from September 16; petrol to sell at GH¢16, diesel at GH¢16.77
35 minutes -
OMJ fufils BECEPIP schorlaship promise, awards 12 learners
40 minutes -
Photos: GAF hands over 175.6km right-of-way for Accra-Kumasi Expressway construction to gov’t
42 minutes -
Accra-Kumasi Expressway to be operated and maintained for 50 years through toll revenue
45 minutes -
LGA holds Landmark Conference, AGM and Elections as the Committee on Politics and Elections emerges as the Overall Best Committee for 2025/2026.
48 minutes -
JSALK Beverages pays medical bills of struggling nursing mothers at Nkawie-Toase Hospital
52 minutes -
Accra-Kumasi Expressway to be operated as business to recover taxpayers’ investment – CEO
58 minutes -
UNFPA calls for presidential intervention as maternal deaths reach crisis levels
1 hour -
Space reserved along Accra-Kumasi Expressway for railway line – Mahama
1 hour -
Ashaiman’s deplorable roads: How long must residents wait?
1 hour -
Elevate Africa Summit to push AfCFTA toward fully functional markets
1 hour -
The search for clean water has failed — so can Nanton Zuo save the water source it already has?
1 hour -
Accra-Kumasi Expressway construction expected to begin in January 2027 – CEO
2 hours