Audio By Carbonatix
Seven potential developers have embarked on a comprehensive inspection of the Seglemi Housing Project.
This crucial step comes on the heels of the Ministry of Works and Housing's announcement of an open call for proposals last month, aiming to solicit private sector involvement in the completion of the long-stalled project.
Since the announcement, the Ministry has witnessed an influx of interest from various construction firms eager to participate in the redevelopment efforts.
The visit of these seven developers, four foreign and three local marks a pivotal moment in the project's timeline, as it signifies the commencement of on-site inspections crucial for formulating competitive bids.
With the deadline for proposal submissions set for July 8, the developers wasted no time in acquainting themselves with the intricacies of the Saglemi site.
Guided by representatives from the Ministry and previous consultants on the project, the developers embarked on a thorough exploration of the site, gaining valuable insights into the project's scope, challenges, and potential opportunities.

Sources at the Ministry said in a bid to ensure transparency and impartiality in the selection process, the Ministry has contracted an independent evaluation entity.
This entity will be tasked with evaluating the proposals and submitting a comprehensive report that will aid in the selection of the most suitable developer for the project.
This is part of the Ministry's commitment to fostering a fair and rigorous evaluation process that prioritises merit and quality.
Further, the Ministry has taken proactive steps to uphold transparency throughout the entire transaction process.
A transparency policy has been published, outlining the Ministry's commitment to disclosing all relevant documents and information in accordance with the proactive disclosure clauses under the Right to Information (RTI) Act.
This policy extends to the publication of bids, evaluation reports, and the final conclusion of the selection process, ensuring that stakeholders have access to critical information every step of the way.
Latest Stories
-
2025 in Review: Fire, power and the weight of return (January – March)
10 minutes -
Washington DC NPP chairman signals bid for USA chairmanship
31 minutes -
Sheikh Ali Muniru remains Volta regional Imam, says National chief Imam
47 minutes -
GoldBod CEO accuses Minority of hypocrisy over Gold-for-Reserves losses
59 minutes -
Sammy Gyamfi to address alleged losses under gold for reserves programme on Jan 5
1 hour -
BoG–GoldBod $214m hit is design failure, not market loss – Minority
1 hour -
Festive season sees minor fires, but domestic cases hit 15–20 daily – GNFS
1 hour -
CLGB statement on IMF-reported losses under the Gold-For-Reserves programme (G4R)
1 hour -
Ghanaian scientist Moses Mayonu pioneers metabolomics research on the global stage
1 hour -
Planetech Week: Israeli Innovation Sweetens Global Tables with Cherry Tomatoes
2 hours -
Minority demands answers on Bawa-Rock Limited monopoly in GoldBod deal
2 hours -
Mahama urged to upgrade Tema General Hospital as TOR begins operationsÂ
2 hours -
Three suspects gunned down as police foil robbery on Anwiankwanta–Obuasi Highway
2 hours -
Volta REGSEC holds emergency meeting after Ho Central Mosque shooting
2 hours -
Child Online Africa raises alarm over inappropriate media exposure among Ghanaian children
2 hours
