Once a 7.5km stretch of dust and bumps, the Ledzokuku Krowor Municipal Assembly (LEKMA) road is now being constructed as materials cover and bring to an end, painful stories of life along the road in that part of Accra.
This Teshie road project has come after years of agitation and complaints reaching its zenith when Joy FM stepped in, in a campaign to get the road fixed.
A contractor is now on site. The third since 2015.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Medical Laboratory Professionals threaten to strike over conditions of service
3 hours -
Residents of Anloga, Keta express frustration over ECG billing
4 hours -
I don’t believe in praying in tongues – Strongman
4 hours -
‘After The floods’: VRA and GMet clash over cause of Akosombo Dam spillage disaster
4 hours -
‘After The Floods’: Victims suffer harsh conditions 6 months after Akosombo dam disaster
4 hours -
Akufo-Addo to unveil Otumfuo commemorative stamp
5 hours -
EduSpots distributes over 100 tablets and laptops to 30 community-led education spaces
5 hours -
Taxation is driving away investors – FABAG General Secretary
5 hours -
Effutu MP commissions office for Hepatitis B; absorbs cost of testing, vaccination and management
6 hours -
Bawumia pushes for land digitisation to tackle land guard menace
6 hours -
Faith-based institutions are instrumental in national development – Bawumia
6 hours -
Upholding the Integrity of Presidential Promises: A call to Ghanaian leaders
6 hours -
I don’t start ‘beefs’; I only reply – Strongman refutes claims
6 hours -
Vice President Bawumia promises reforms to turn Ghana’s fortunes around
6 hours -
REGSEC warns encroachers along Tema-Sakumono Ramsar site as it races to prevent flooding
6 hours