Audio By Carbonatix
The Public Utilities Regulatory Commission (PURC) has concluded its investigations on the causes of the recent erratic power supply which began earlier this year.
The report established a number of factors that led to the challenges in power supply including technical challenges in the natural gas supply network, new transmission infrastructure being constructed on the National Interconnected Transmission System (NITS) and Planned and unplanned maintenance activities on the aspects of the NITS.
Others include a "reduction in reactive power support in the mid-portion of the country and emergency upgrade and modification works on the NITS to increase reactive power support and improve voltage is in the mid-portion of the country," PURC stated in a press release signed by the Executive Secretary Mami Dufie Ofori.
The report established that there were delays in the implementation of various capital projects that were required to improve network reliability and availability.
Some of these projects are currently ongoing and the Commission will continue to closely monitor the works to ensure compliance with quality-of-service benchmarks, they added.
"Following the conclusion of the preliminary investigations, the commission in accordance with its regulatory processes is ascertaining the liabilities and the possibility of compensation to consumers in recognition of any loss occasioned by the erratic power supply."
"The commission further encourages consumers to report any case of damaged equipment to the nearest ECG/NEDCo office for the appropriate action failing which the report may be forward to the PURC for redress," the statement read.
PURC, in its reports, stated that the need for an updated and consolidated generation and transmission master plan cannot be overemphasized. Thus, the Commission set up to investigate the power outages would therefore engage all relevant stakeholders to ensure that this is achieved.
"The commission assures key stakeholders and the general public of its commitment to protecting the interest of consumers and utility service providers."
Latest Stories
-
Asempa FM RTI request reveals previous Gold-for-Reserve programme losses, 2025 figures outstanding
8 minutes -
Police recruitment underway in Greater Accra with documentation and body Checks
12 minutes -
BoG Governor urges unified national action to reform gold sector and halt economic losses
31 minutes -
Wendy Shay wins Best Female Artiste Western Africa at 2025 AFRIMA
32 minutes -
NPP Karaga delegates endorse Bawumia massively as hundreds turn up to receive him
38 minutes -
Sarkodie wasn’t aware Ebo Noah would be at 2025 Rapperholic – DJ Mensah
40 minutes -
Passenger arrivals at airport drop marginally in 9-months of 2025, but container traffic at habours up 20.6% – BoG
40 minutes -
Water crisis in Teshie enclave worsens as desalination plant remains shut over debts
48 minutes -
Implications of US withdrawal from Global Climate Treaties for Ghana and Africa
48 minutes -
KATH forced to detain patients over unpaid bills amid rising cost pressures
53 minutes -
Underground Mining Alliance awards GH¢504m in scholarships to 57 students, apprentices in Ahafo Region
55 minutes -
Construction sector activities declined by 4% in quarter 3, 2025 – BoG
56 minutes -
Prince Amoako Jnr set to wear iconic No.10 jersey at FC Nordsjaelland
58 minutes -
Deposit mobilisation strategy strengthens NIB PLC’s financial performance
1 hour -
Manufacturing sector activities improved in 9-months of 2025; direct taxes collected increased by 18%
1 hour
