Audio By Carbonatix
The Ga East Municipal Assembly has begun demolishing structures built in waterways and drainage reservations as part of efforts to reduce flooding and protect lives and property during the rainy season.
The exercise, which is currently underway in parts of the municipality, forms part of a broader strategy to enforce planning regulations and improve the free flow of stormwater through major drainage channels.
Speaking to JoyNews correspondent Stephen Mensah, officials said hundreds of unauthorised structures erected in waterways and flood-prone areas have been identified and will be affected by the ongoing demolition exercise.
A National Disaster Management Organisation (NADMO) official involved in the operation said the affected area serves as a major convergence point for floodwater from surrounding communities, making it particularly vulnerable to flooding whenever there is heavy rainfall.
"The water is this one at the back. When it rains, the water rises and meets runoff coming from Madina towards this area," the official explained.
He noted that when water levels increase, nearby communities become inundated.
"You can see the level. The water rises to that point and floods all these areas. That is why we are carrying out this exercise," he said.
According to the official, removing structures obstructing the watercourse will help ensure the smooth passage of floodwater.
"We are doing this so that the water can move freely from the upper sections through the channel. All these areas get flooded, but people are still building here," he added.
Residents in the area acknowledged the persistent flooding challenges.
One resident said movement becomes difficult whenever the drains overflow.
"When the gutter overflows, the whole place gets flooded and we don't have anywhere to pass," he said.
Another resident attributed the worsening flooding situation to recent developments along the waterway.
"It was not like this before. But after the building was put up there, I realised that it was contributing to the flooding," she said.
The Assembly has warned that more unauthorised structures obstructing drainage channels will be pulled down in the coming days as authorities intensify efforts to mitigate flooding across the municipality.
Latest Stories
-
Ghana’s central bank pumped nearly $13bn into FX market in just a year to save local currency, IMF says
3 minutes -
Bueman SHS wins historic Riddle Bonanza at 2026 NSMQ Oti Regional Qualifiers
9 minutes -
Ghana Police Service and Education Ministry fined again for RTI non-compliance
14 minutes -
NDC sets dates for 2026 internal executive elections
16 minutes -
Afenyo-Markin donates laptops to newly posted teachers in Effutu
16 minutes -
Korle-Bu, Komfo Anokye, all five teaching hospitals fined GH₵20,000 over failure to submit RTI reports
21 minutes -
RTI Commission fines 254 public institutions GH¢20,000 each over failure to submit 2025 reports
30 minutes -
St. Mary’s Seminary SHS, Lolobi secures final Oti ticket to 2026 NSMQ
37 minutes -
BoG’s gold purchase programme involving GoldBod lost GH¢22bn in 2025, IMF says
45 minutes -
Jude Michelle elected second female KNUST SRC President with over 6,000-vote margin
49 minutes -
Ghana Chamber of Mines donates GH¢2m relief items to NADMO to support flood victims
55 minutes -
Health Ministry reveals strategy to clear backlog of over 107,000 unemployed nurses in Ghana
1 hour -
AJ Poundz receives prize for winning ‘Best Dressed’ at 2025 Guinness Ghana DJ Awards
1 hour -
Ghana inaugurates UNESCO Commission General Assembly to strengthen global engagement
1 hour -
August 6 demo date was not deliberate; NDC should stop politicising helicopter crash anniversary – Nana B
1 hour