Audio By Carbonatix
President Nana Akufo-Addo has inspected the completed “one-village-one-dam” project constructed in Namoligo in the Talensi constituency of the Upper East Region.
Accompanied by the Upper East Regional Minister, Paulina Abayage, and the Agriculture Minister, Dr Owusu Afriyie-Akoto, President Akufo-Addo was told that the construction, in fulfilment of the 2016 manifesto pledge of the New Patriotic Party (NPP), was undertaken by the Ghana Irrigation Development Authority (GIDA).

The Namoligo Dam is one of 10 small dams which have been completed by government through GIDA/Ministry of Food and Agriculture. The contract for the construction of the Dam was awarded in May 2019 and has been substantially completed.
With the project costing ¢2.5 million, the Namoligo dam has a water storage capacity of 145,300 cubic meters and has a minimum dam life of 40 years.
The President was told that, for occasional (supplementary) irrigation, the cropping area for vegetables can increase to some 50 hectares, with optimum yields assured, since crops will always get the needed water required for healthy growth throughout the growth stages.

To facilitate water access for irrigation, two outlets, controlled by sluice valves, have been provided at vantage points to allow free flow of water on either side of the valley.
Indeed, GIDA has constructed 10 similar small dams with irrigation outlets in Upper West Region, and the Northern Region, all in support of “One Village One Dam” programme.
The President urged members of the community to take very good care of the dam, and hoped that the Namoligo community and the other 10 communities that are beneficiaries of the dams, will use them for their own benefit.

Since 2017, Government of President Akufo-Addo, in its bid to fulfil the 1-village-1-dam policy, has constructed a number of small-earth dams for water storage, irrigation, and for use by livestock. This is the largest stock of such small earth dams provided since independence.
Thus far, 439 small-earth dams are under construction, and 375 have been completed, and 64 are between 90-100% complete. Each dam provides water for up to five hectares of farmland.

Under the Akufo-Addo government, the Tono irrigation dam has been rehabilitated and rehabilitation projects on both the left and right banks of Kpong are also in progress.
Latest Stories
-
Iran war reshapes Brics ties but also exposes divisions
6 minutes -
Mahama to oversee handover of right-of-way clearance for Accra-Kumasi Expressway
20 minutes -
Moroccan teenager joins 1,000 young people for IFY 2026 Children’s Programme in Russia
22 minutes -
ISS cooperation offers lessons for resolving conflicts on earth – Russian cosmonaut
30 minutes -
Laboma demolition: 48 Engineer Regiment denies claims of no prior notice
37 minutes -
Photos: Young Africans join global delegates in Russia for 2026 IYF
39 minutes -
100 young journalists lead coverage of International Festival of Youth in Russia
39 minutes -
Business owners, residents pack up belongings amid demolition at Laboma
41 minutes -
US Rep. Tom Tiffany says he sustained minor injuries after plane makes emergency landing
45 minutes -
Ebola infections top 7,000 in Democratic Republic of Congo, government data show
46 minutes -
Critics celebrate Céline Dion’s ‘high-stakes’ comeback show in Paris
46 minutes -
New report of attack on Strait of Hormuz shipping fans fears of threats to oil supplies
46 minutes -
African delegates join IFY 2026 clean-up, collect 22 cubic metres of waste from Russian lake
49 minutes -
48 Regiment Engineers leads demolition exercise at Laboma Beach resort
1 hour -
Laboma demolition: Laboma Director calls for halt, says over 3,000 workers at risk
1 hour