Audio By Carbonatix
President Nana Akufo-Addo has inspected the completed “one-village-one-dam” project constructed in Namoligo in the Talensi constituency of the Upper East Region.
Accompanied by the Upper East Regional Minister, Paulina Abayage, and the Agriculture Minister, Dr Owusu Afriyie-Akoto, President Akufo-Addo was told that the construction, in fulfilment of the 2016 manifesto pledge of the New Patriotic Party (NPP), was undertaken by the Ghana Irrigation Development Authority (GIDA).

The Namoligo Dam is one of 10 small dams which have been completed by government through GIDA/Ministry of Food and Agriculture. The contract for the construction of the Dam was awarded in May 2019 and has been substantially completed.
With the project costing ¢2.5 million, the Namoligo dam has a water storage capacity of 145,300 cubic meters and has a minimum dam life of 40 years.
The President was told that, for occasional (supplementary) irrigation, the cropping area for vegetables can increase to some 50 hectares, with optimum yields assured, since crops will always get the needed water required for healthy growth throughout the growth stages.

To facilitate water access for irrigation, two outlets, controlled by sluice valves, have been provided at vantage points to allow free flow of water on either side of the valley.
Indeed, GIDA has constructed 10 similar small dams with irrigation outlets in Upper West Region, and the Northern Region, all in support of “One Village One Dam” programme.
The President urged members of the community to take very good care of the dam, and hoped that the Namoligo community and the other 10 communities that are beneficiaries of the dams, will use them for their own benefit.

Since 2017, Government of President Akufo-Addo, in its bid to fulfil the 1-village-1-dam policy, has constructed a number of small-earth dams for water storage, irrigation, and for use by livestock. This is the largest stock of such small earth dams provided since independence.
Thus far, 439 small-earth dams are under construction, and 375 have been completed, and 64 are between 90-100% complete. Each dam provides water for up to five hectares of farmland.

Under the Akufo-Addo government, the Tono irrigation dam has been rehabilitated and rehabilitation projects on both the left and right banks of Kpong are also in progress.
Latest Stories
-
FIFA World Cup: Iran moves camp from USA to Mexico, amid ongoing conflict
11 minutes -
Tamale police arrest suspect with large quantities of drugs
45 minutes -
BoG pushes for integrated African payment systems to boost trade — Dr Asiama
48 minutes -
Two people shot in encounter with Secret Service near the White House
1 hour -
Red Cross volunteers die from suspected Ebola in DR Congo
1 hour -
US Secret Service investigates reports of shots near White House
2 hours -
ECG injects GH¢3m into power upgrades across 40 Accra communities
2 hours -
‘Owadiah’ makes history: William Opare becomes first Ghanaian to break 45 seconds in 400m
2 hours -
Scottish woman ‘was on a mission’ to find out who her Ghanaian husband was. Then she died
2 hours -
Four Ada SHS students arrested after viral cutlass threat video sparks alarm
2 hours -
Christopher Bonsu Baah win Staff Player of the Year award in debut season with Al Qadsiah
3 hours -
Laryea Kingston’s Uganda beat Ghana 8-7 on penalties to secure U-17 World Cup spot and extend Black Starlets’ absence to nine years
3 hours -
FIFA U17 World Cup playoffs: Uganda beat Black Starlets on penalties to qualify
3 hours -
GN Savings and Loans: Ndoum thanks Mahama after Court of Appeal victory
3 hours -
2026 U17 WWCQ: Goalfest in Accra as Black Maidens hit Liberia for six
3 hours