Audio By Carbonatix
The Civil Society Platform on Oil and Gas is drawing attention to the need for the laws on environment to be respected before full scale operations begin on phase 2 of the Jubilee project.
The group maintains that the Environmental Impact Assessment for the first phase of the Jubilee project was fraught with weaknesses for which a permit should not have been issued.
These were contained in a communique issued by the platform and signed by Dr. Steve Manteaw after a meeting to review Natural Resources and the Environment.
The Civil Society Campaign group argues that phase 1 of the Jubilee project had too many shortcomings. It cited misclassification of the project, weak emphasis on the social dimensions of impacts, the absence of an assessment of oil spills and the dumping of drilling wastes in the sea as part of the hazards Jubilee phase 1 had on the environment.
The platform is also worried that the FPSO in use is a converted second-hand single hulled tanker which is very weak and increasingly out of use. According to the group, classification carried out on half of the FPSO by Bureau Veritas revealed that the FPSO’s made out of converted oil tankers are unsuitable to serve as oil production and storage platforms.
The platform also wants full disclosure on the status of strategic environmental and social impact assessment started by the Environmental Protection Agency a year ago.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Ntim Fordjour accuses government of deliberate LGBT push in schools
1 minute -
National security task force storms ‘trotro’ terminals to halt illegal fare hikes
4 minutes -
U.S. visa restriction development for Ghana concerning – Samuel Jinapor
5 minutes -
Quality control lapses allowed LGBT content into teachers’ manual – IFEST
12 minutes -
Akufo-Addo’s name will be “written in gold” in Ghana’s history in the fullness of time – Jinapor
14 minutes -
Tread cautiously about financial hedging – US-based Associate Professor to BoG
15 minutes -
LGBTQ curriculum row: Quality control failure, not timing, caused teacher manual controversy – Dr Anti-Partey
18 minutes -
Banks wrote-off GH¢1.39bn as bad debt in 10-months of 2025
22 minutes -
I cannot rate the lands minister’s performance, but… – Abu Jinapor
24 minutes -
Accra’s traffic to blame for public transport crisis—GPRTU
24 minutes -
Banks’ record 47.8% year-on-year growth in profit to GH¢12.6bn in 10-months of 2025
60 minutes -
We stand by our US$214 million loss by BoG due to GoldBod exposure – IMF
1 hour -
GIPC to host Regional Investment Roadshows in Central and Western Region
1 hour -
Open letter to President John Agyekum Kufour
1 hour -
IGP promotes two officers, commends five others in Tema Regional Police command
1 hour
