Audio By Carbonatix
The World Bank has released $150 million to the government as additional funding to improve on flood resilience in the Odaw River Basin in the Greater Accra Region.
The loan is to fund the Greater Accra Resilient and Integrated Development (GARID) Project aimed, among other objectives, at improving flood risk and solid waste management for over 2.5 million people in the Odaw River Basin.
The World Bank Country Director for Ghana, Liberia and Sierra Leone, Pierre Laporte, said “the bank is happy to support Ghana in these times of macroeconomic challenges and to help contribute to a holistic flood management approach through this additional financing of GARID”.
Mr Laporte further explained that the gesture was critical for achieving “the World Bank’s twin goals of ending extreme poverty and boosting shared prosperity as well as increasing the resilience of African cities”.
“This additional support fills a financing gap resulting from the triggering of the Contingency Emergency Response Component (CERC) in 2020 due to the COVID-19 pandemic and the inclusion of resettlement compensation for approximately 2,800 project affected persons.
It also addresses cost overruns for major infrastructure investments due to inflation and engineering requirements” the country director indicated.
The Senior Urban Specialist and Task Team Leader for GARID project, Catherine Lynch, for her part said “the planned flood mitigation infrastructure investments under GARID will directly reduce the flooding risks for urbanising and economically productive areas of the Greater Accra Region, limiting the direct flood hazards on more than 138,000 people”.
The GARID project, an inter-ministerial initiative being implemented by the Ministries of Local Government, Decentralisation and Rural Development, Works and Housing, Sanitation and Water Resources spans 2020 and 2025.
The project will continue to prioritise investments that enhance resilience to flood risks and improve solid waste management systems in targeted communities of the Odaw River Basin.
It will provide additional resources to continue financing the structural measures to increase the detention capacity for flood mitigation in the basin area.
It will also provide targeted interventions in the low-lying areas of the basin and upstream interventions related to the management of municipal solid waste.
The GARID project, through investments supported under the Climate Resilient Drainage and Flood Mitigation Measures component, will also provide significant climate change adaptation benefits.
The huge economic and social impacts of the flood event of June 3, 2015 which affected 53,000 people and caused major damage and losses estimated at $55 million and $105 million in reconstruction cost necessitated the establishment of GARID by the government with support from the World Bank to address perennial flooding challenges in the capital.
Latest Stories
-
Iran war reshapes Brics ties but also exposes divisions
5 minutes -
Mahama to oversee handover of right-of-way clearance for Accra-Kumasi Expressway
19 minutes -
Moroccan teenager joins 1,000 young people for IFY 2026 Children’s Programme in Russia
21 minutes -
ISS cooperation offers lessons for resolving conflicts on earth – Russian cosmonaut
29 minutes -
Laboma demolition: 48 Engineer Regiment denies claims of no prior notice
37 minutes -
Photos: Young Africans join global delegates in Russia for 2026 IYF
39 minutes -
100 young journalists lead coverage of International Festival of Youth in Russia
39 minutes -
Business owners, residents pack up belongings amid demolition at Laboma
41 minutes -
US Rep. Tom Tiffany says he sustained minor injuries after plane makes emergency landing
45 minutes -
Ebola infections top 7,000 in Democratic Republic of Congo, government data show
45 minutes -
Critics celebrate CĂ©line Dion’s ‘high-stakes’ comeback show in Paris
46 minutes -
New report of attack on Strait of Hormuz shipping fans fears of threats to oil supplies
46 minutes -
African delegates join IFY 2026 clean-up, collect 22 cubic metres of waste from Russian lake
48 minutes -
48 Regiment Engineers leads demolition exercise at Laboma Beach resort
1 hour -
Laboma demolition: Laboma Director calls for halt, says over 3,000 workers at risk
1 hour