Audio By Carbonatix
The President of the Republic, Nana Addo Dankwa Akufo-Addo, has inspected work on Central Oil Mills Limited, a wholly Ghanaian-owned agro-processing company located at Jukwa Mfuom/Asamanso in the Hemang Lower Denkyira District of the Central Region.
Central Oil Mills Limited, which specialises in oil palm development and palm oil processing, is operating under Government’s 1-District-1-Factory initiative.
President Akufo-Addo visited the factory, on Tuesday, October 19, on day 2 of his 2-day tour of the Central Region.
As part of Government’s Industrial Transformation Agenda, Central Oil Mills, established in 2010, was identified as one of the potentially viable but distressed companies.

To this end, an organisational audit was conducted by a team of technical consultants from the Ministry of Trade and Industry, who recommended the company to the Ghana EXIM Bank for support under the One District One Factory (1D1F) programme.

Ghana Exim Bank, on 21st November 2018, approved a Medium-Term Loan Facility of GH¢12 million for Central Oil Mills Limited to undertake three main activities:
These are the rehabilitation and expansion of an existing primary crude palm oil processing factory at Jukwa-Mfoum, the establishment of a brand new secondary (value-addition) oil palm processing factory at Jukwa-Asamanso, with capacity to process vegetables (Canned and bottled products), and the expansion and development of oil palm plantation.

The Bank subsequently approved a supplementary loan of GH¢2 million for the project, thus bringing the total loan approved for the project to GH¢14 Million.
The new factory at Asamanso and the expansion work at Mfuom are about 95% and 90% complete respectively, and are both expected to be fully completed by November 30, 2021.
The project involves the expansion of an existing oil palm mill with an initial capacity of 2,400 metric tonnes of fresh fruit bunches (FFB) per annum into a bigger mill with a minimum capacity of 12,000 metric tonnes of FFB per annum on a single shift, with capacity to do double shifts.

With a yield of 20%, this will produce 2,400 metric tonnes of palm oil per annum which could be processed into secondary canned and bottled products. In addition, through the revitalisation process, the company has increased its storage capacity from 30 metric tonnes to 150 metric tonnes.
The company has rehabilitated its existing oil palm plantation and has initiated the process to expand its plantation by 200 acres per annum over five years. This is being supported by the acquisition of new trucks, and farm implements to support cultivation and transportation. The company also has existing nucleus farms at Jukwa Mfuom and its environs and also about 50 out-grower individuals.

The project is expected to create a minimum of 200 direct jobs from its current skeletal workforce of 30 persons when fully operational. More than 500 indirect jobs will be created within two years at both factory sites and from the plantation.
Buyers from South Africa, Italy, Netherlands and Nigeria are already in discussions with the company for export of finished products, thus opportunity to generate foreign exchange for the country.
Latest Stories
-
Church of Pentecost supports over 2,000 BECE candidates in Obuasi with career guidance seminar
8 minutes -
Brandon Asante and Coventry all but promoted to Premier League despite Sheffield Wednesday draw
29 minutes -
GPL 2025/26: Late Kwartemaa strike downs Hearts in Tema
36 minutes -
Ghana Faces Sierra Leone Moment as Prosecutorial Powers come under strain
46 minutes -
Don’t consume fish or seafood from Tema Shipyard until further notice – FDA warns
50 minutes -
Why volunteering might be Africa’s most underrated career accelerator
57 minutes -
ActionAid Ghana raises concern over gender gaps in Feed Ghana Programme
59 minutes -
Windstorm wreaks havoc in Gushegu, displacing nearly 2,000 residents and damaging schools
1 hour -
Friends of Bridget Bonnie Marks her 35th birthday with donation to Kasseh Model Health Centre
2 hours -
From Ekumfi Kokodo to the Pulpit Stage: Essi Donkor’s gospel journey takes shape
2 hours -
Landfilling waste management creates no value, it’s an economic waste
2 hours -
Photos: Speaker Bagbin Commissions MPs constituency office under parliamentary decentralisation programme
3 hours -
Black Stars technical advisor Winfried Schäfer sacked as GFA shakes up backroom staff
3 hours -
Wenchi water project almost complete, critical to gov’t agenda – GWL MD
3 hours -
Anti-LGBTQ+ bill not part of government’s legislative agenda – Inusah Fuseini
3 hours