
Audio By Carbonatix
The Electricity Company of Ghana (ECG) has taken delivery of 15 drones to provide effective monitoring and auditing of the company’s networks.
This is to ensure more efficient services to clients in line with modern trends.
The deployment of the unmanned aerial vehicles (UAVs) in the company’s operations is meant to curb the vegetation interference in the network, as well as identify weak spots on the networks for prompt rectification.
Consequently, engineers of the company are currently undergoing training at the company’s training school in Tema to be able to operate the drones.
The first batch of 50 engineers completed their training yesterday.
At the closing ceremony of the first training workshop in Tema on Thursday, the Managing Director of ECG, Kwame Agyeman-Budu, expressed optimism that the inclusion of the drone system in ECG’s operations would improve efficiency.
He said it will ensure reliability of power supply to customers, modernise its operations, and position the company to become a leading utility service provider.
Drones
The Wingtra Drones, supplied and serviced by Sahara Natural Resources, can last an hour in flight and travel as far as eight kilometres while still in contact with the control tablet, which records information and videos for later reference.
On the average, each region will be given two drones to assist in the operational duties.
Vital tools
Mr. Agyeman-Budu intimated that ECG stood to benefit greatly from the unmanned aerial vehicles as artificial intelligence, including drones, were rapidly becoming vital tools in the operations of transmission and distribution utilities because of their ability to provide access to difficult locations on power lines.
He said it would provide routine technical inspections in the power network to identify defects, right of way inspections of overhead lines to identify vegetation encroachment.
He said it would also efficiently facilitate thermal inspections of the network to identify hot spots, verification of work done by bush clearing and tree cutting contractors, route mapping for construction of new lines, as well as trouble-shooting of faulted portions of the network to locate faults for isolation on overhead lines.
Additionally, it would provide access to difficult locations on power lines for purposes of carrying out inspections without shutting down the lines and creating outages.
Another benefit of the use of the drones, Mr. Agyeman-Budu indicated, was that it would reduce the risk of injury to technical staff, and lower the cost of carrying out inspections by using aerial thermal cameras.
“In addition to all these, the deployment of the drones would reduce the time frame of carrying out inspections in the power system.
“Now activities which could take days to execute could be done within minutes by the drones,” Mr. Agyeman-Budu said.
Latest Stories
-
Davis Opoku proposes AI auditing, contract portal to strengthen public financial accountability
3 minutes -
We’ve signed $5.5bn with co-development partners to transform Ghana’s economy, 1.7m jobs to be created – 24-Hour Economy Secretariat
11 minutes -
Kumasi-Anwomaso power upgrade to more than double transmission capacity – Energy Minister
16 minutes -
Italy–Ghana Water Technology Workshop boosts partnerships to improve water sector solutions
19 minutes -
Terry Yegbe helps Lech Poznan to Polish Super Cup win
19 minutes -
Temporary power interruptions unavoidable during Kumasi-Anwomaso upgrade – Jinapor
38 minutes -
NCA invites applications for 5G license
44 minutes -
BoG’s own answers validate Bawumia’s gold reforms – Oppong Nkrumah
47 minutes -
AGRA Food Security Monitor shows a mixed picture for Ghana’s food markets
1 hour -
Public confidence is Supreme Court’s greatest asset — Chief Justice
2 hours -
Asiedu Nketiah’s tours were to strengthen NDC, not campaign for presidency – Mustapha Gbande
2 hours -
24-Hour Economy about productivity, not round-the-clock work – Goosie Tanoh
2 hours -
GNFS intensifies fire safety campaigns across Eastern Region communities
2 hours -
Wontumi acted within NPP election rules, not against party leadership – Campaign Secretariat
2 hours -
Kumasi to experience temporary power outages as GRIDCo begins major transmission line upgrade
2 hours