Audio By Carbonatix
The Electricity Company of Ghana (ECG) has announced that the Ghana Grid Company Limited (GRIDCo) has reduced power supply at some of its supply points in the Greater Accra Region.
The two stations are the Pokuase Bulk Supply Point and the Smelter 2 Bulk Supply Point.
This is expected to affect power supply in some parts of Accra.
The affected areas include “Ghana Steel, Palace Mall, Furniture City, Lovely Transport, Kpone Barrier, Kingdom Transport, GPHA Terminal (Kpone), Sethi Realty, Abodakpi Farms, Kpone Dump Site, Bediako, Golf City and its environs.”


Kwabenya, Agbogba, Maryera, part of Teiman, Ayi Mensah, Katapor, Top Herbal, Bohye, Abloradjei, Pure Water, Pokuase Township, Fountain Gate and surrounding areas will also be affected.
In a letter dated Thursday, March 28, the ECG stated that power will be restored as soon as GRIDCo turns on supply.
However, the ECG apologised to all customers in the affected areas.
“ECG regrets the inconvenience caused to the affected customers.”
Meanwhile, the Electricity Company of Ghana (ECG) has failed to meet the ultimatum to provide a load-shedding timetable.
The deadline was provided by the Public Utilities Regulatory Commission (PURC) following the incessant power outages.
The Commission had instructed the ECG to submit a comprehensive report covering the period from January 1, 2024, to the present date.
This was supposed to also outline the volume of load curtailed for each outage incident, energy not served, and the number of customers affected.
The Commission had given the ECG a seven-day deadline to furnish them with the required information.
However, despite the stipulated timeframe, the ECG has failed to comply with the PURC's request.
Background
In the past months, there has been erratic power supply across the country, and many Ghanaians have demanded that the Electricity Company of Ghana (ECG) and the Energy Ministry release a load-shedding timetable so they can plan their lives.
Both the Energy Ministry and the ECG have denied "dumsor" claims. As such, they insisted that there was no need for a timetable.
Latest Stories
-
Xenophobic Attacks: First batch of Ghanaians evacuated from South Africa arrive
9 minutes -
Upper West Minister joins muslims in Wa for Eid al-Adha prayers
14 minutes -
TOR receives one million barrels of ‘Bonga Crude’ for refining operations
23 minutes -
National Chief Imam commends President Mahama for key development initiatives
29 minutes -
NADMO warns of possible demolition exercise at Sampah Valley after Weija dam spillage
35 minutes -
Dual citizenship: A privilege or a dangerous illusion?
50 minutes -
President Mahama announces road construction projects in Zongo communities
59 minutes -
SA officials claim only 10 of nearly 300 Ghanaian migrants repatriated were legally in the country
1 hour -
Volta MMDCEs demand extension of Ghana Card registration for school children
1 hour -
WHO urges ceasefire in Congo to contain Ebola as cases surge
1 hour -
New head of Hamas’ military wing killed in Gaza City strikes, Israel saysÂ
1 hour -
Dozens killed in Lebanon as Israeli troops expand ground campaignÂ
1 hour -
Rights group accuses UAE of training Colombian mercenaries for Sudan’s warÂ
2 hours -
DR Congo appeals to FIFA for World Cup ticket refunds amid Ebola travel restrictionsÂ
2 hours -
CUTS lauds BoG on suspension of proposed MTN new charges
2 hours