Audio By Carbonatix
The government has announced plans to construct an ultra-modern, state-of-the-art power control centre following a fire incident that damaged critical control units at the switchyard of the Akosombo Dam, triggering power supply challenges across parts of the country.
The move is aimed at strengthening Ghana’s electricity management system and preventing future disruptions.
Energy Minister John Jinapor disclosed this during a briefing to President John Dramani Mahama on Thursday, April 30, during an inspection visit to the facility.
According to the Minister, although the Akosombo plant is currently not operating at full capacity due to technical setbacks, power generation across the country is still meeting demand. He stressed the importance of building redundancy within the system to ensure stability even when key plants face challenges.
“As we speak, generation is meeting demand, and we need that redundancy,” Mr. Jinapor said, noting that engineers are working to restore two affected units at the plant as quickly as possible.
He explained that once the units are fully operational, attention will shift to constructing a new control centre equipped with advanced technology.
"...We will then build an utra mordern state of the art control center with all the modern equipment. And then we will compartmentalise it so that if there is a fire incident in one section, the others are automatically shut, and it is contained in that section."
The facility, he said, will incorporate artificial intelligence and be integrated with a central command system in Accra to provide real-time monitoring of power generation and distribution nationwide.
Mr. Jinapor indicated that the recent incident at Akosombo has exposed vulnerabilities in the current system, but also presented an opportunity to modernise infrastructure and adopt innovative solutions.
Latest Stories
-
Students displaced after storm rips off school roof in North Tongu
5 minutes -
E&P’s 100% gold sale to GoldBod sets benchmark — Legal Rep
7 minutes -
Photos: Mahama visits Akosombo Dam, calls for upgrade after fire incident
11 minutes -
Damang Mine sells 100% of first gold output to GoldBod, BoG in historic move
12 minutes -
Recurring power issues tied to investment gaps — Michael Aidoo
24 minutes -
High cost of doing business pushing firms out of Ghana – GUTA
28 minutes -
Faith under fire : Is the church still a sanctuary of faith or a space losing moral authority?
31 minutes -
First National Bank introduces its first Private Banking Lounge, redefining Premium Banking in Ghana
38 minutes -
Macro stability delivering early gains, broader impact underway – Finance Ministry Advisor
42 minutes -
Businesses gaining confidence as macro stability improves – Tech. Advisor, Finance Ministry
42 minutes -
Gov’t will not overspend in 2026 –Tech. Advisor to Finance Minister assures
54 minutes -
REMAPSEN Special Advisor visits Ghana ahead of 2026 Media Forum and Awards in Accra
1 hour -
Installed capacity is not enough — Energy Committee MP raises concerns over power reliability
1 hour -
Inflation expected to return to 8 ± 2% in 2026 – BoG
1 hour -
‘It doesn’t add up’ – Health Committee Chair questions Kasoa ‘no bed’ claim over maternal death
2 hours