Audio By Carbonatix
Residents of Teshie Bush Road in the Ledzokuku Municipality of the Greater Accra Region have called on the Electricity Company of Ghana (ECG) to fix an electric pole burnt by fire.
The residents said the electric pole was burnt by fire for almost two months and posing danger to people.
They said the fire incident occurred after one of the many electric prepaid meters fixed on the pole caught fire in October.
Mrs. Mary Djane, a resident, said though personnel of the Company visited the location and mounted a new pole, nothing had since been done leaving them in a state of uncertainty.
“They told us that after the elections on December 7, they will come and change the electric pole and it’s been two weeks now and they haven’t returned yet’’ she said.
Another resident, Mr Daniel Adjei Narh, whose meter also got burnt, said, “The burnt pole has turned to a death trap for our kids who play nearby, because no one knows when it will fall off.’’
Mr Narh also appealed to the ECG to address the situation to bring relief to the residents and passersby and avert future disasters.
Latest Stories
-
Ghana’s mining deaths fall sharply, but Chamber insists ‘three deaths are too many’
3 minutes -
Tatale Sanguli officials destroy expired food products, warn traders
9 minutes -
Police arrest two watchmen over alleged defilement of 14-year-old student
15 minutes -
The woman behind General Mosquito: Could Ghana be meeting its next First Lady?
16 minutes -
Court remands man over alleged Labone bank robbery attempt
20 minutes -
Supreme Court to rule today on challenge to legal vacation warrants
26 minutes -
Tamale Metropolitan Assembly distributes 10,000 bags of fertiliser to farmers
31 minutes -
TUSAAG suspends strike, resumes work after renewed talks with government
35 minutes -
PIAC marks 15 years of oil revenue accountability and transparency
42 minutes -
Adongo calls for non-political interference in $1.46bn Heritage Fund review
47 minutes -
FDA records GH¢70m surplus in 2025 amid concerns over ageing lab equipment
48 minutes -
Arise Ghana demands stronger commitment to end galamsey
50 minutes -
96% of Ghanaian pensioners willing to work beyond retirement age – Study
54 minutes -
Ghana gets nuclear power plant simulator
60 minutes -
Temporary Akosombo power control facility to be ready by September – Energy Ministry
1 hour