Audio By Carbonatix
The Jubilee partners have announced a planned halt of oil production offshore for 21 days.
The suspension of production is to make way for routine maintenance of the Floating, Production, Storage and Offloading (FPSO) platform, the FPSO Kwame Nkrumah.
The facility, currently moored at the Jubilee Oil Field in a water depth of 1,100 metres, has been in service for three years and has so far produced 77 million barrels of oil as at the close of production activities offshore on Tuesday September 10.
The planned shutdown is slated for Friday, September 20, 2013.
The General Manager of Tullow Ghana, lead operator of the Jubilee Field, Mr Charles Darku, said, “We embark on this exercise as part of our culture of adhering to world-class standards of operational performance management to ensure that the vessel operates at its optimal level and over its projected life span.”
He said the Jubilee partners were committed , to adopting proactive preventive measures, rather than reactive, whereby the operator had to carry out any maintenance when there was a defect or breakdown.
Mr Darku said a critical aspect was the building of a robust industry which could be counted among the best in the world.
Asked if it would not affect the target operation to rake in revenue for the partners and the state, he said the planned shutdown had been factored into the plan and forecast of production for the year.
“This is necessary for safety reasons and it is normal practice in these circumstances,” he said.
Mr Darku said the maintenance activity would include vessel inspection and cleaning and replacement of safety critical equipment.
He said the move was in line with its obligations for external class certification and adherence to global maintenance and integrity standards used throughout the oil industry.
The partners said there w be a team which would be personnel between Takoradi location of the FPSO Nkrumah to undertake the aspects of the maintenance w( He said the partner undertaking the maintenance with support services from a variety of upstream oil and gas service providers.
The FPSO has the cap process 120,000 barrels of ol and has a storage capacity of 1. barrels, with an associat production capacity of 160 million standard cubic feet a day.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
Trade Minister applauds GUTA as a pillar of economic growth; Prez Mahama honoured
29 minutes -
President’s brother’s takeover of Damang Mines is ‘untidy’ – Alhassan Tampuli
35 minutes -
It’s not true that gov’t decided not to renew the lease for Gold Fields – Bobby Banson
39 minutes -
Ghana to boost tomato production with 60-hectare irrigated farms and processing initiatives
58 minutes -
E&P’s takeover process of Damang Mines was very clean – Inusah Fuseini
1 hour -
Damang takeover: There is not going to be any job loss; it is a lease change – Bobby Banson
1 hour -
Gold Fields didn’t stop mining at Damang mines; such claims are untrue – Bobby Banson
2 hours -
Engineers and Planners currently operate only in Ghana – Bright Simons
2 hours -
Lands Minister has no legal basis to restrict lease to Ghanaian firms – Bright Simons
2 hours -
Gov’t’s refusal to renew Gold Fields’ lease was simply untenable – Bright Simons
2 hours -
SOS Children’s Villages Ghana deepens partnership with Gender Ministry
2 hours -
Gender Ministry celebrates Christina Koch, reaffirms commitment to empowering girls
2 hours -
Live stream: Newsfile digs into E&P’s takeover of Damang Mines, OSP powers and Anti-LGBTQ Bill
3 hours -
Moody’s maintains Ghana’s rating at Caa1, revises outlook to positive
3 hours -
Zambia elevates tourism education to national priority as President Hichilema backs continental summit
4 hours