Audio By Carbonatix
Ghana’s power crisis has worsened with the Ashanti region where only 50 megawatts of power is available for distribution being the hardest hit.
Ghana's second largest city requires 200 megawatts of power.
The Electricity Company of Ghana (ECG) says 50 megawatts is only enough to power security installation in the region leaving an estimated 4.8 million residents without power.
Ashanti regional Public Relations Officer of the Electricity Company of Ghana, Erasmus Kyere Baidoo, told JoyNews there is a major generation gap of almost 600 megawatts of power nationwide.
A load-shedding timetable has been thrown completely out of gear with some citizens enjoying only 30 minutes of power in 24 hours in some areas in Accra, the national capital.
JoyNews has also learnt that some of the thermal units at Aboadze in the Western region have been shut down due to lack of fuel, exacerbating already bad energy situation.
More soon.
Latest Stories
-
MOMO loan defaulters can’t escape – MTN Ghana
27 seconds -
Mixed reactions in Volta Region over acquittal of ex-MASLOC boss
2 minutes -
Gabonese President departs Accra after concluding three-day state visit
5 minutes -
526 young people graduate from precision quality internship in Volta
9 minutes -
Strengthen partnerships to sustain fight against human trafficking – IJM
11 minutes -
Economic recovery should be measured by impact on citizens’ lives – Bokpin
12 minutes -
Government urged to integrate victim protection into anti-galamsey efforts
17 minutes -
Ghana’s trade surplus triples to GHS48bn in 2025
19 minutes -
Sam George distributes fertilisers to over 5,100 farmers at Ningo-Prampram
23 minutes -
297 GAF personnel receive flood relief
28 minutes -
GIPA calls for infrastructure expansion to address post-harvest losses
30 minutes -
National Biosafety submits Ghana’s fifth National Biosafety Report
48 minutes -
Mahama leads nation in bidding farewell to James Victor Gbeho
1 hour -
CRS holds forum on sustainable sand mining on White Volta River
1 hour -
Fifa scraps controversial World Cup investment plan
6 hours