Audio By Carbonatix
Electric vehicle assembly firm, Solar Taxi, is investing in building battery packs for solar vehicles at its assembly plant.
Sourcing batteries is highly competitive with the increasing interest of car manufacturing companies in producing electric vehicles.
The local project is expected to help reduce the cost and efficiency of batteries which is the main component of Electric Vehicles.
JoyNews' Nana Yaw Gyimah visited the battery lab in Kumasi and has come through with this report.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Latest Stories
-
The Great African Divergence: Why the dream of a borderless Africa is a dangerous premature reality
5 minutes -
Association of Banks CEO hails “unpalatable” decision to save COCOBOD from collapse
8 minutes -
New nuclear talks between US and Iran begin in Geneva
19 minutes -
Why “good enough” is destroying Ghana’s fashion manufacturing future
21 minutes -
Gov’t is impoverishing cocoa farmers—Awal Mohammed
28 minutes -
US civil rights leader Jesse Jackson dies aged 84
30 minutes -
Bond market: Turnover declines 42.47% to GH¢2.27bn
35 minutes -
Ghana faces 130 million gallon daily water supply deficit — GWL
37 minutes -
Benjamin Asare ‘not at the level’ of Black Stars – Fmr Kotoko management member
40 minutes -
GFA Prez Kurt Okraku targets AFCON triumph
41 minutes -
GWL MD identifies Kasoa as major hub of illegal water connections
42 minutes -
‘He subjected me to constant, severe, chronic violence’ — Woman breaks 50-year silence on alleged abuse by Pastor father
56 minutes -
Illegal connections cost GWL GH₵8.6 Million between August–December 2025
1 hour -
WPL 2025/26: Hasaacas Ladies move to top of Southern Zone as Ampem Darkoa continue lead
1 hour -
Ghana Water Limited needs over GH₵3.5bn to replace ageing pipelines — MD
2 hours
