
Audio By Carbonatix
The Volta River Authority (VRA) has restored the water supply system of the people of Aveyime in the North Tongu District.
This is part of its Emergency Preparedness Plan created in May 2023 to provide relief to communities affected by the controlled spill of the Akosombo and Kpong Dams.
The flooded township raw water intake pumps at Aveyime have been relocated to higher ground.

A pump protection shed with power panels has been constructed and connected to the water treatment system.
The team worked around the clock, by digging trenches and installing pipes to provide an immediate supply of potable water to the community.
The Deputy Chief Executive (Services) Ken Arthur, is to hand over the newly commissioned water system to the people of Aveyime today, October 19.
This is to ensure access to clean potable water for drinking, cooking and bathing.

The Authority is passionate about ensuring that the affected communities receive as much relief as possible and they are committed to making life easier for the flood victims.
This water supply restoration is the first of many to be carried out in the safe havens. There are plans to expand and provide water to every man, woman and child in the affected communities.
In areas with shut-off water supply, VRA, on a daily basis sends tankers of clean potable water to these communities. In addition, they also provide thousands of bags of sachet water for drinking.

The focus on quick, clean water supply by VRA is to help curb the spread of waterborne diseases in the communities. Water is constantly supplied to the flood victims to ensure that such a basic human need is addressed.
Although it continues to provide medicine supplies, canned food, toiletries, drugs, mattresses, buckets, rice, sugar, mosquito nets etc. to the flood victims, VRA has taken it upon itself, to provide technical relief as well to the communities affected by the controlled spill.

As a company of engineers, VRA aims to go beyond just the supply of relief items and drugs to help the flood victims.
VRA is thereby extending its world-class technical competencies to the people in these communities.
VRA is proactively providing relief solutions for the flood victims because they have made a promise to the people to leave no one behind and they vow to stand by it.
Latest Stories
-
South Africa’s anti-migrant protesters march nationwide, after thousands flee violence
1 minute -
Ebola outbreak could cost Africa up to $3.6 billion, UN says
12 minutes -
Bayer’s $7.25 billion Roundup settlement gets August hearing date
22 minutes -
TikTok to settle with teen plaintiff before California social media trial, law firm says
30 minutes -
Mbappe scores twice as France breeze past Sweden into last 16
39 minutes -
Chinese tycoon sentenced to 30 years in US jail
48 minutes -
Apple says it is releasing updates early in response to AI cybersecurity concerns
56 minutes -
Boeing says IT outage affected computer systems, applications
1 hour -
AC Milan sign PSG’s Portugal striker Ramos for £60m
1 hour -
Villa among four Premier League clubs fined by Uefa
1 hour -
Rosenior nears management return at Paris FC
1 hour -
Basketball superstar LeBron James to leave LA Lakers
2 hours -
Flooding in Accra – It’s all about leadership (or lack of it)!
2 hours -
Warrior King’s Tourbillon raises the bar for African luxury watchmaking
2 hours -
Koeman resigns, while Netherlands report racist abuse
2 hours