Audio By Carbonatix
China's largest dump is already full - 25 years ahead of schedule.
The Jiangcungou landfill in Shanxi Province, which is the size of around 100 football fields, was designed to take 2,500 tonnes of rubbish per day.
But instead it received 10,000 tonnes of waste per day - the most of any landfill site in China.
China is one of the world's biggest polluters, and has been struggling for years with the rubbish its 1.4 billion citizens generate.
How big is the landfill site?
The Jiangcungou landfill in Xi'an city was built in 1994 and was designed to last until 2044.
The landfill serves over 8 million citizens. It spans an area of almost 700,000 square metres, with a depth of 150 metres and a storage capacity of more than 34 million cubic metres.
Until recently, Xi'an was one of the few cities in China that solely relied on landfill to dispose of household waste - leading to capacity being reached early.
Earlier this month, a new incineration plant was opened, and at least four more are expected to open by 2020. Together, they are expected to be able to process 12,750 tonnes of rubbish.
The move is part of a national plan to reduce the number of landfills, and instead use other waste disposal methods like incineration.
The landfill site in Xi'an will eventually become an "ecological park".
Where does China's rubbish end up?
Waste collected in 2017
Source: National Bureau of Statistics; BBC
How much waste does China produce?
In 2017, China collected 215 million tonnes of urban household waste, according to the country's statistical yearbook. That's up from 152 million ten years earlier.
The country had 654 landfill sites and 286 incineration plants.
It is not clear what China's recycling rate is, as no figures have been released. China plans to recycle 35% of waste in major cities by the end of 2020, according to one government report.
This July, sorting and recycling rubbish was made mandatory in Shanghai - leading to "a sense of panic" among some residents.
In 2015, there was a landslide a rubbish dump in the southern city of Shenzhen, killing 73 people.
The dump was designed to hold four million cubic metres worth of rubbish with a maximum height of 95 metres.
When it collapsed it was holding 5.8m cubic metres of material with waste heaps up to 160m high.
One town in Malaysia was left swamped with foreign waste
Does China deal with other countries' waste?
Not anymore. It used to, until the end of 2017 when it decided to ban the import of 24 different grades of rubbish.
In 2017 alone, China took in seven million tonnes of plastic rubbish from Europe, Japan and the US - and 27 million tonnes of waste paper.
Other countries, including Malaysia, Turkey, the Philippines and Indonesia, have picked up some of the slack.
- Who's sending back plastic waste?
- The small town with a dirty secret
- Reality Check: Where is the plastic waste mountain?
But they struggled to deal with the amount of waste coming in - often times resulting in massive, out of control landfills in their own countries.
Some of these countries have now banned the import of certain types of rubbish and are even sending it back.
Latest Stories
-
GPRTU in Savannah Region to protest alleged eviction in Damongo
19 minutes -
Re: Reinsurance does not replace process — A response to the SIGA–SIC defence
34 minutes -
Gender Ministry supports Harriet Amuzu in ongoing abuse case
47 minutes -
AG joins plaintiff to scrap OSP ?: We should be mindful of the mischief in this – Bobby Banson
53 minutes -
Samson Lardy Anyenini questions willingness of Attorneys-General to prosecute political colleagues
56 minutes -
It is only fair the OSP is heard in Supreme Court case – Bobby Banson
1 hour -
Asiedu Nketia resumes Ashanti tour, second leg kicks off on Sunday
1 hour -
NLA denies salary cut claims, threatens legal action over reports
1 hour -
BoG Governor honoured for stabilising cedi, improve inflation
1 hour -
Kyebi Easter Homecoming 2026: A resounding success!
2 hours -
Trade Minister applauds GUTA as a pillar of economic growth; Prez Mahama honoured
2 hours -
President’s brother’s takeover of Damang Mines is ‘untidy’ – Alhassan Tampuli
2 hours -
It’s not true that gov’t decided not to renew the lease for Gold Fields – Bobby Banson
2 hours -
Ghana to boost tomato production with 60-hectare irrigated farms and processing initiatives
3 hours -
E&P’s takeover process of Damang Mines was very clean – Inusah Fuseini
3 hours