Audio By Carbonatix
Egypt, Ethiopia, and Sudan have reached an initial agreement on the filling and operation of a mega-dam being built on the River Nile.
A joint statement by the three countries, along with the US and the World Bank, says negotiators had agreed to fill the reservoir of the Grand Ethiopia Renaissance dam during the rainy season between the months of July and August.
It, however, makes no mention on the crux of the dispute which is the speed with which to fill up the mega-dam. Ethiopia wants to do it in six years, but Egypt has proposed at least a 10-year period - fearing that a shorter span will affect the downstream flow of the River Nile which it relies on for 90% of its water.

A final deal will be signed on 28-29 January, when ministers from the three countries meet again in Washington.
The preliminary agreement, which was brokered by US Treasury Secretary and the World Bank President, takes into consideration Ethiopia’s needs for starting the early generation of electricity but also outlines mitigation measures for Egypt and Sudan in case of prolonged drought periods in the downstream countries.
This latest deal eases tensions between Ethiopia and Egypt which have been brewing since Ethiopia begun the construction of the dam in 2011.
Once completed, the $5bn (£3.8bn) project will be Africa’s biggest hydropower dam with a capacity of 6,000MW.
Latest Stories
-
Telecel rewards 3 more customers with monthly cash prizes in Dream Car Promo
41 seconds -
Today’s front pages: Monday, July 27, 2026
2 minutes -
Armed robbers shoot MoMo vendor in violent Agona Mankron rampage
9 minutes -
The Dog Stars to One Night Only: 10 of the best films to watch this August
1 hour -
Dialectical Democracy (Part One)
2 hours -
Who owns the child benefit? A family debate that is tearing homes apart abroad
2 hours -
Water crisis cripples learning at Nalerigu SHS as students abandon night studies to search for water
2 hours -
IMF Board set to approve Ghana’s final Programme Review, greenlight post-bailout economic plan
3 hours -
Ghana to deploy condom vending machines nationwide by end of 2026 to boost HIV prevention
3 hours -
NDPC briefs Speaker Bagbin on proposed consolidated national development plan
3 hours -
Presbyterian Church launches Disability Policy, urges members to champion inclusion
3 hours -
GPHA plans sports centre as it marks 40th anniversary
3 hours -
Galamsey affecting fish production in Bono Region – Fisheries Commission
3 hours -
Dambai College of Education appoints new Principal and Vice Principal
3 hours -
Ho West chiefs and queens commend Volta Regional Minister for inclusive leadership
3 hours