Audio By Carbonatix
Health Minister, Kwabena Mintah Akandoh, has disclosed that about 70 to 80 percent of equipment in the country’s health facilities are no longer functioning, posing a serious threat to healthcare delivery nationwide.
According to him, the last comprehensive retooling of health facilities took place in 2014, when hospitals and clinics were supplied with essential working equipment, staff capacity and other critical resources.
"As I speak to you now, the last time we did major retooling of our health facilities was in 2014," he said on JoyNews' The Pulse on Tuesday.
However, a decade on, most of the equipment has broken down, leaving the sector severely constrained.
"And I can tell you that about 70 to 80 percent of these equipment are obsolete. We can't even get more than 10 to 20 percent in the system. Even before these ten years, there were others that when they were bought, they couldn't serve the facilities more than two years," he mentioned.
The Minister noted that the government is considering two options to address the challenge: partnering with the private sector or implementing a state-sponsored intervention.
"We are looking at how we can go back to Private Public Partnership, how the private can also come and partner the health facilities. We are also looking at how government can look for some money to buy some strategic equipment."
While admitting that the health sector is confronted with numerous challenges, Dr Akandoh expressed optimism that with the right strategies, the situation can be turned around.
"It has not been easy; the system is a critical one. The are a lot of challenges in the system, but I can assure you that we are fixing them," he emphasised.
Latest Stories
-
Power outage in Accra West and scheduled maintenance in Ashanti Region
3 minutes -
Life is consequences – Counselor Perfect on confession, infidelity and difficult choices
9 minutes -
Global renewable energy jumps by 692GW in 2025, strengthening energy security – IRENA Report
14 minutes -
PAC summons 2 over GH₵8.2m ‘Toilet for All’ payments without work done
26 minutes -
Calls for practical, collective leadership on food security intensify ahead of 34th FAO Regional Conference
35 minutes -
IMANI uncovers SIGA-backed push to concentrate public sector insurance business with SIC
36 minutes -
Prof Bokpin backs calls for gov’t to cut fuel levies
39 minutes -
We shouldn’t be quick to remove taxes on fuel – Joe Jackson
48 minutes -
Betrayal in Accra: Ghana’s Pact with Brussels Stabs Pan-Africanism in the Back
48 minutes -
PassionAir announces new airport infrastructure dev’t charge effective April 1
52 minutes -
MISLEADING! SIC MD’s claim that SIGA encouraged State Insurance placements refuted by a letter directing SOEs
56 minutes -
NPA Chief Executive inaugurates steering committee for downstream petroleum centre of excellence
1 hour -
Eight Aframso robbery suspects arrested while sharing loot in Ejura, one shot dead
1 hour -
LEAP review to delay first quarter payments by 2 weeks – Gender Minister
1 hour -
Supreme Court marks 150 years of service
2 hours
