Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
The Kissi Agyebeng Removal Bid: A Look at the Numbers
11 minutes -
DVLA to roll out digitised accident reports, new number plates and 24-hour services
38 minutes -
DVLA Workers’ Union opens 2025 Annual Residential Delegates Congress with call for excellence, equity and solidarity
1 hour -
Scholarships Secretariat sets December 8–9 interviews for Commonwealth Scholarship applicants
1 hour -
WASSCE decline reveals deep gaps, there’s need to overhaul education system – Franklin Cudjoe
2 hours -
JOY FM Drive Time host Lexis Bill leads fans up Aburi Mountain in energetic ‘Walk With Lexis’ fitness experience
2 hours -
2026 World Cup: Ghana to open campaign in Toronto against Panama
2 hours -
President Mahama, Lordina support retired Assemblies of God pastors, widows with medical care and Christmas gifts
2 hours -
2025/26 GPL: Nations FC fight back to claim 2-1 win over Heart of Lions
2 hours -
Tanzania responds to international criticism over October post-election events
3 hours -
Burkina Faso plans to restore death penalty for treason, terrorism, espionage
3 hours -
One killed, 27 arrested in Tamale police operation
3 hours -
GTDC calls for synergy as its marketplace gains global traction
3 hours -
ADB lauds gov’t’s agricultural initiatives, commits to providing needed support
3 hours -
US Embassy hosts World Cup draw watch party, fans upbeat about Ghana’s chances
3 hours
