Audio By Carbonatix
Trade Minister, Elizabeth Ofosu-Adjare, has disclosed that the Komenda Sugar Factory has been disconnected from power and water supply over unpaid bills.
She made the revelation on the floor of Parliament on Tuesday, as she provided an update on the state of the Komenda Sugar Factory.
The legislator explained that the facility is currently burdened by significant debt, compounding longstanding technical and operational challenges that have stalled the facility’s operations.
According to her, the factory has been unable to run at full capacity due to extensive deficiencies in its machinery and equipment, which have not been refurbished since the plant was constructed in 2016.

“Technical and operational deficiencies have prevented the factory from running at full capacity. The machinery and equipment of the factory have not been refurbished since construction in 2016. Equipment generators and motors need maintenance, and the boiler top coil needs replacement to bring the factory back to life,” she told Parliament.
Mrs Ofosu-Adjare further revealed that the factory has been disconnected from the national grid by the Electricity Company of Ghana and from water supply by the Ghana Water Company Limited due to accumulated unpaid bills.
“Added to the poor state of the equipment, the facility has accumulated significant debts,” she said.

Beyond infrastructure and utility challenges, the Minister pointed to raw material shortages as a major obstacle to reviving the factory.
Video above from a 2021 JoyNews feature on the Komenda Sugar Factory rusting away
She explained that the farming communities that were expected to supply sugarcane have become disengaged, largely because of weak institutional support structures and unclear procurement arrangements.
“The farming community which was expected to anchor the raw material supply remains disengaged due to lack of institutional support and unclear procurement channels,” she noted.
As part of government’s response, Mrs Ofosu-Adjare announced that the Ministry of Trade and Industry has prioritised the engagement of a transactional advisor to restructure and package the factory for private sector participation.

“The ministry has prioritised the engagement of a transactional advisor to package the factory and secure a strategic investor to operationalise the factory and farms in the 2026 budget,” she said.
The Komenda Sugar Factory, a flagship industrial project under Ghana’s industrialisation drive, was originally envisioned to reduce the country’s heavy reliance on imported sugar and create jobs within the Central Region.
However, years of operational setbacks have left the facility largely idle, prompting renewed calls for a sustainable revival strategy anchored in private sector investment and efficient farm-to-factory linkages.
Latest Stories
-
‘Huge and heavily-laden’ SHS prospectus burdens parents, time to review – Dafeamekpor
38 seconds -
Gov’t commits nearly GH¢2bn to School Feeding Programme, reaches 4.5m children
3 minutes -
Over a million Ghanaians reached in nationwide child rights campaign – Gender Minister
5 minutes -
Over 226,000 households graduated from extreme poverty after LEAP reassessment – Gender Minister
10 minutes -
Oxfordshire village votes to leave UK over asylum housing plan
12 minutes -
Gender Equity Act has moved from advocacy to enforcement — Minister
15 minutes -
Eight special schools to receive digital equipment under disability inclusion drive
20 minutes -
GoldBod model draws interest as 7 African countries seek gold governance lessons
20 minutes -
Trump says Kennedy Center to close as court rules his name must stay off building
22 minutes -
1,432 human trafficking victims receive rehabilitation support – Minister
23 minutes -
Ghana’s household registry now profiles 11.24 million people for social protection targeting
27 minutes -
Saudi Arabia says it shot down Houthi drone south of Mecca
29 minutes -
LEAP coverage expands to 450,000 households as grant rates increase
30 minutes -
At least 20 killed after war-damaged Gaza building collapses
32 minutes -
Japan records more than 100,000 centenarians for first time
40 minutes