Audio By Carbonatix
The West African Gas Pipeline Company (WAPCo) has denied the claim by the Ghana Grid Company Ltd (GRIDCO) saying there is a shortage of gas due to the company’s inability to supply gas.
GRIDCO said the situation created a supply gap of 650MW at peak time in the country thus causing power outages in several areas.
However, GRIDCO in a statement assured that efforts are in place to restore the gas supply from Atuabo.

“The Ghana Grid Company Ltd, (GRIDCo), the “Operator” of the National Interconnected Transmission System informs the general public that there is a deficit in thermal power generation due to limited gas supply from the Atuabo Gas Processing Plant (GPP) and the West African Gas pipeline (WAPCo).”
“This has created a supply gap of 650MW at peak time which will affect consumers in some parts of the country. The inconvenience caused is regretted,” the statement issued by the Corporate Communications Ghana Grid Company Ltd added.
However, WAPCo has absolved itself of any blame.
According to the company, it is ready and available to transport gas any time needed.

“The West African Gas Pipeline Company Limited’s (WAPCo’s), attention has been drawn to press releases issued by GRIDCo citing limited gas supply from WAPCo and from the Electricity Company of Ghana citing a WAPCo technical challenge as contributing to the power challenge experienced in Ghana last night.”
“WAPCo wishes to set the record straight that we did not have any technical issues and our facilities were, and still are, fully available to deliver gas.”
Latest Stories
-
Ex-manager case: Black Sherif’s contract breach deemed ‘technical’ as court awards GH₵50k instead of GH₵1.1m demand
14 minutes -
GRA launches AI-powered system to boost revenue and curb customs fraud
19 minutes -
DVLA launches plans for permanent office in Jomoro to improve service delivery
24 minutes -
Bekwai Court jails houseboy for pouring acid on SHS leaver
25 minutes -
Ablekuma Fan milk residents protest over bad roads
28 minutes -
Gov’t aware of transport challenges, taking steps to fix them– Vice President
30 minutes -
TTAG advises teacher trainees to stay home as CETAG strike remains unresolved
39 minutes -
Kwakye Ofosu explains exclusion of Finance Minister, BoG Governor from Economic Advisory Group
41 minutes -
Kelvin Ofori joins Slovenian champions Olimpija on loan from Slovan Bratislava
42 minutes -
Gov’ t to support Metro Mass, Aayalolo and private sector with high-occupancy buses – Prof Opoku-Agyemang
52 minutes -
Ashanti Regional Minister announces restart of some legacy road projects
1 hour -
JOY FM gave me the platform for my voice to be heard in Ghana and beyond – Reverend Sam Korankye Ankrah
1 hour -
Our ambition is to win the WAFCON – Kurt Okraku
1 hour -
IMF clarifies $214m figure as accounting cost, not GoldBod loss
1 hour -
How Sedina Tamaklo misappropriated state funds leading to her 10-year jail term
2 hours
