Audio By Carbonatix
The long-standing power supply issues in Kumasi, the capital of the Ashanti region, have sparked a mix of hope and scepticism among residents after Energy Minister John Jinapor assured them that the situation would soon be resolved.
For weeks, Kumasi has experienced frequent power outages, disrupting daily life and causing frustration among residents.
While some are hopeful about the minister's promise, others are doubtful that real change is on the horizon.
During his recent visit to the region, Mr Jinapor dismissed calls for a load-shedding timetable, explaining that the country is generating enough power to meet both domestic and external demands, making load shedding unnecessary.
“I am happy to announce that, so far, the supply situation has been stable, and we are able to export some power. However, there is still more work to be done. Beyond generating power, we need to evacuate, transmit, and distribute it effectively. We are working around the clock to address these challenges and ensure a reliable, steady power supply for everyone,” Mr Jinapor said.
While the minister’s comments provided some reassurance, many residents remain concerned about the frequent disruptions.
Some residents shared their frustration. “The power outages are really disruptive. We thank the minister for coming, but we hope he will follow through with his promises. The ECG, or whoever is responsible, needs to give us prior notice of outages so businesses can plan ahead. These outages are causing many problems, we need better communication from our leaders so we can plan accordingly.”
In response to these concerns, Mr Jinapor emphasised the need for continued improvements in infrastructure, particularly in the country’s power transmission and distribution networks.
He assured residents that efforts were underway to address these challenges and improve the overall stability of the power supply.
Meanwhile, discussions between Mr Jinapor, Finance Minister Dr Cassiel Ato Forson, and WAPCo officials are ongoing to resolve related issues concerning debt owed to the West African Gas Pipeline Company (WAPCo).
The General Manager in charge of Corporate Affairs at WAPCo Dr Isaac Doku, said, “We are confident that the Ministry of Finance will address the matter, and we are on standby. Once the payment is confirmed, we will go back to our shareholders and provide proof that the situation has been resolved,” said Dr Doku.
"For now, we continue to wait, hoping the government’s assurances will bring an end to the power woes they have long endured,"Mr Doku concluded.
Latest Stories
-
Ghana reaffirms commitment to transparency in diamond sector ahead of Kimberley Process review
28 minutes -
Today’s Front pages: Tuesday, March 10, 2026
29 minutes -
Crude prices dropped from $110 to $93 immediately Trump said Iran war was complete – Edudzi Tameklo
34 minutes -
GAYO, UrbanBetter Cityzens push for clean air and just transition as Ghana marks Independence Day
35 minutes -
UniMAC wins 2026 Commonwealth Day debate at Parliament
52 minutes -
Agrotech Fair to spotlight local agric machinery, agro-processing equipment and cutting-edge technologies – EXIM BanK CEO
1 hour -
Ghana unlikely to face immediate fuel shortage despite Middle East tensions – Senyo Hosi
2 hours -
SSNIT ends 2025 with over GH₵25bn asset value, investments – Director-General
2 hours -
Tema Oil Refinery plans capacity boost to 45,000 barrels per day
2 hours -
NCA Chief highlights 5G’s potential for mining and agriculture in Ghana
2 hours -
Invest in sports infrastructure, not World Cup fan sponsorship – Edem Agbana to gov’t
2 hours -
Private sector support vital for STEM growth
2 hours -
Police crack down on ECG cable theft, arrest 10 suspects
2 hours -
Local mining firms face discrimination under new royalty regime – Steve Manteaw
2 hours -
Telcos risk sanctions over poor call quality as NCA tightens standards
2 hours
