
Audio By Carbonatix
Kenya's border with Somalia will reopen in April, almost 15 years after it shut because of attacks by the Islamist militant group al-Shabab, President William Ruto has announced.
Based in Somalia, the group has masterminded a series of deadly assaults in Kenya, including one on a shopping centre in the capital, Nairobi, killing 67 people in 2013 and one at a university in Garissa two years later, killing 148.
The plan was announced in 2023, but subsequent attacks delayed the implementation.
Ruto said the intention to reopen two crossings follows years of security assessments, adding that there will be a heavy deployment of security forces to ensure the move does not compromise safety.
Kenya has also been concerned about illicit weapons and other contraband goods being smuggled across the border.
The president announced the plan on a visit to the border town of Mandera, in Kenya's far north-east, which has a large population of ethnic Somalis.

"It is unacceptable that fellow Kenyans in Mandera remain cut off from their kin and neighbours in Somalia due to the prolonged closure of the Mandera Border Post," Ruto posted on X.
He hoped that the re-opening would boost "cross-border trade for the mutual prosperity of our people".
In a speech, he asked all residents of Mandera, which has been targeted several times, to "join in the battle against al-Shabab. These al-Shabab are useless, I want to assure that Kenya will work together with you, just help us combat these criminals and terrorists."
In addition to the attack on the Westgate mall and Garissa University, other major al-Shabab attacks in Kenya include the killing of 28 bus passengers in Mandera county in 2014 and an assault on a hotel in Nairobi five years later, which left at least 21 people dead.
In 2015, Kenya had embarked on building a perimeter barrier along the country's 680km (423-mile) common border because of the militant threat, but the project was suspended after nearly three years when only 10km (6 miles) of a wire fence had been built at a cost of $35m (£26m).
Latest Stories
-
NSS investigating GH¢60 allowance deductions as refund decision awaits probe outcome
41 seconds -
Rejecting cedi coins is a criminal offence punishable by law – BoG warns traders
4 minutes -
Wontumi brought to Accra High Court for Tano Nimiri case while serving 20-year sentence
7 minutes -
UCL 2026/27: Terry Yegbe scores in first leg qualifier as Lech Poznan beat AGF
16 minutes -
Reform military budgeting process to reduce corruption risks – Dr Sowatey
22 minutes -
John Boadu backs Wontumi, urges party supporters to remain calm after conviction
24 minutes -
Foreign Affairs Minister welcomes Burundi President, AU officials for 2026 Accra health summit
25 minutes -
EduSpots selected among 31 organisations worldwide for FIFA Global Citizen Education Fund
36 minutes -
Ghana becomes first African country to sign accelerated patent grant deal with US
37 minutes -
Mahama, former presidents, other dignitaries to attend Apostle Kwadwo Safo’s funeral – Family confirms
42 minutes -
Ukrainian drones hit more sites of Russian online retailer Wildberries
46 minutes -
ECG announces planned power outages in five regions
46 minutes -
Contractors on $500m World Bank road projects will face sanctions for poor work – Agbodza
48 minutes -
Three killed, 11 injured in head-on collision at Ajumako Kokoben
49 minutes -
Korle-Klottey, Tema and Accra Metro lead HIV table in Greater Accra – AIDS Commission
1 hour