
Audio By Carbonatix
The Minister for Roads and Highways, Governs Kwame Agbodza, has directed contractors executing the government's Big Push road projects to incorporate all necessary safety measures into their works, particularly on highways, to minimise accidents and protect road users.
He noted that inadequate safety measures at construction sites often leave residents feeling compelled to devise their own means of protecting themselves from speeding vehicles, a practice he said poses additional risks to road users.
Mr Agbodza issued the directive on Thursday during an inspection of the reconstruction of the Anyirawase–Ho–Titrinu Road in the Volta Region.
He, however, dismissed suggestions that road projects are designed based on favouritism, explaining that the scope of every project is determined by technical studies and engineering assessments.
Mr Agbodza stressed that the government would not approve variations that increase the cost of projects under the first phase of the Big Push programme.
"Under the Big Push, no variation. We will not add anything that takes the cost of any project under the phase one cedi above the contract price," he said.
The Minister pointed out that even his own district capital had not been selected for a dual carriageway, underscoring that project designs are based on need rather than personal or political considerations.
"I am the road minister. The Big Push is not going through my district capital. We are not dualising my district capital.
"So the idea that everybody who didn't even have a fit-for-purpose road and is getting a road now begins to say that 'I like the road, but I want it bigger'—the engineers have thought about it. Where there's dual carriage, there's dual carriage. They didn't consider Adaklu as needing a dual carriage now."
He appealed to residents to support the implementation of the programme's current phase, saying that not all communities could receive expanded road infrastructure at the same time.
Mr Agbodza acknowledged concerns raised by the Volta Regional Minister and opinion leaders who argued that neighbouring communities had been allocated dual carriageways while theirs had not.
Referring to the neighbouring constituencies of Agotime-Ziope and Adaklu, he maintained that the allocation of road projects was never based on favouritism but on the recommendations of engineers following detailed technical evaluations.
He reiterated that the government remained committed to delivering quality road infrastructure under the Big Push initiative while ensuring projects are completed within their approved budgets and according to engineering specifications.
Latest Stories
-
Mahama announces expansion of specialist cardiac care centres across Ghana
2 seconds -
Korle Bu’s new Cath Lab marks ‘better recovery’ after 2025 fire setback – Mahama
15 seconds -
Friday is not a holiday: What you need to know about the June 10-11 national cleaning days
4 minutes -
Government pays GH¢400 million capital for Women’s Bank, says bank will open before end of 2026
4 minutes -
Long-term funding critical to child protection efforts — Gender Minister
11 minutes -
Bagbin advocates traditional and religious inclusion in governance
15 minutes -
Azumah Ghana rejects reports over Black Volta dispute, says E&P lawfully acquired project shares
37 minutes -
Cabinet has approved establishment of Ghana Medical Equipment Services Ltd – Mahama
46 minutes -
No structure on waterways will be spared – Greater Accra Regional Minister warns
49 minutes -
GH¢18.8 million in development money, vanished
49 minutes -
EOCO releases former NAFCO CEO Hanan Abdul-Wahab after airport re-arrest
51 minutes -
Gov’t to establish agro-processing drive to boost jobs, food security
55 minutes -
Driver, mate injured as truck carrying second-hand bales overturns at Alajo
55 minutes -
Digital fraud now an economic threat, not just a crime issue – Prof. Bokpin
1 hour -
Mobile-money histories should unlock loans, insurance for informal workers – BoG fintech head
1 hour