Audio By Carbonatix
The Asantehene, Otumfuo Osei Tutu II, will undertake a royal visit to the Jimi Land Reclamation and River Watercourse Rehabilitation Project near Obuasi on Wednesday, October 14, 2026.
During the visit, he will plant trees and inspect Lot 1, marking a major milestone in restoring lands severely degraded by unregulated small-scale mining.
The environmental initiative responds to widespread damage caused by unregulated small-scale gold mining, known as galamsey, which has stripped forest vegetation, contaminated soils, and left hazardous open, water-filled pits across the Obuasi and Adansi areas.
Toxic runoff and heavy sediment buildup along the Jimi River threaten the Jimi Dam, a critical source of drinking water for communities across the Adanse Traditional Area.
The reclamation effort stems from Otumfuo’s advocacy against illegal mining during the Mining in Motion forum, which led to the creation of the Ashanti Green Initiative.
Operating as the initiative's flagship pilot project, the Jimi reclamation brings together key institutional partners, including the Manhyia Palace, providing overall strategic vision and royal patronage; Ashanti Green Initiative, serving as project lead on behalf of the Asantehene and drives community engagement; and AngloGold Ashanti, delivering technical and operational support.
Others are the Ministry of Lands and Natural Resources, overseeing policy, permitting, and security enforcement through NAIMOS and the Blue Water Guard; and the Environmental Protection Authority (EPA), providing regulatory guidance for ecological restoration along the river and buffer zones.
Covering 153 hectares across three designated lots in the Obuasi East Municipality as well as the Adansi Akrofuom and Adansi Asokwa Districts, the pilot targets heavily impacted sites near Gyimisokakraba, Ayease, and Akwesi Ankromakrom.
Restoration works are structured around a six-step process: Backfilling open mining pits and deep gullies; Re-grading spoil heaps and terracing steep slopes; Containing, capping, or removing heavy-metal soil contamination; Installing drainage and erosion control structures to safeguard the river corridor; Restoring and enriching topsoil health; and replanting the land with kenaf, a commercial fibre crop.
Due to residual heavy-metal contamination risks in the soil, kenaf was selected over food crops. The fast-growing fibre crop will be harvested for manufacturing sacks, rope, and eco-composites, establishing a secure income stream for local farmers.
Long-term project plans include continuous water testing to protect the Jimi Dam, as well as ongoing tracking of soil, vegetation, biodiversity, and community health outcomes.
Organizers intend for the Jimi pilot to serve as a national model to rehabilitate other mining-damaged land and water systems across Ghana.
Latest Stories
-
Mahama honoured at 2026 World Health Summit in Berlin for global health leadership
1 minute -
Breast cancer is not a death sentence – Besease Kontire Obaapanin, Magmina Foundation lead awareness campaign
3 minutes -
EcoBank invests in digital education of 4 Garisson School to mark 40 years in Africa
34 minutes -
AGI urges investment in skills and raw materials to strengthen local manufacturing
37 minutes -
GPL 2026/27: ‘We have to rectify our mistakes’ – Boadu reacts to Aduana FC defeat
38 minutes -
No disability access, no building permit – KMA declares
38 minutes -
Asantehene to lead environmental restoration effort at Jimi Land Reclamation Site
42 minutes -
Poor Ghanaians are being jailed because they cannot afford justice – Crime Check Foundation
43 minutes -
No conflict in appointing Emelia Agbenyo as Deputy EC Chair – NDC
44 minutes -
87-year-old man jailed 20 years for defiling 9-year-old girl at Ofankor
46 minutes -
Sankofa Gold targets 70kg output after 9-month shutdown
49 minutes -
Tamale, Bolgatanga had just one Legal Aid lawyer between them – Kwesimintsim MP
56 minutes -
PAC orders eviction of former irrigation company MD from official residence
60 minutes -
Legal Aid Commission has offices in only 45 of Ghana’s 261 districts, needs 180 more staff
1 hour -
Challenging Heights welcomes Ghana’s Tier 1 ranking, calls for more anti-trafficking funding
1 hour