Audio By Carbonatix
Reverend Martin Amenaki, the Municipal Chief Executive for the Ketu North Municipal Assembly, and some officials of the Assembly, have visited the three potential sites for the proposed the 24-hour economy market project in the municipality.
Their visit, together with the Consultants working on the 24-hour economy market project, was to assess the proposed site.
Rev. Amenaki said the Assembly initially presented a six-acre parcel of land located along a major road for consideration.
However, following consultations with community members and opinion leaders, an alternative proposal emerged to redevelop the existing central market, to improve accessibility and enhance economic activity.
The consultants visited the old market site, which was estimated at about 1.92 acres, but found it inadequate, as the project required a minimum of three acres to accommodate essential components, including parking space.
Rev. Amenaki noted that ongoing construction activities and road reservations could further reduce the usable space, making the site unsuitable for the full scope of the project.
The team also inspected a second location at Dzeshime, considered strategically positioned, but measuring approximately 1.98 acre, still below the required land size.
“The consultants have requested detailed layout plans for the proposed sites to determine whether adjustments can be made to fit the project. Otherwise, we may have to revert to the originally proposed site,” he stated.
Mr Kwasi Aboagye of PPMC International, Consultants for the project, confirmed that three sites had been assessed.
He said the municipality was expected to benefit from a “Model Three” 24-hour market, which would comprise shops, a banking facility, a police post, a daycare centre, open trading sheds, and a car park.
“We have asked the Assembly to submit layout plans for the three sites. Based on that, we will determine the most suitable and viable location for the project,” he said.
Mr Aboagye noted that although the ideal land size for the model market ranges between two and three acres, slightly smaller spaces could still be considered with appropriate design adjustments.
He said if the land was a little less than two acres, they would assess how best to manage it to meet the project’s requirements.
Latest Stories
-
UMB S.P.E.E.D. Stars lift Bankers Football Gala trophy
2 minutes -
MMFL makes strong showing at JoySports Invitational 2026
18 minutes -
MTN Media Republic, Ghana Wildlife Society embark on bird, butterfly walk
24 minutes -
Fuel Prices: Star Oil holds petrol at GH¢14.97, raises diesel to GH¢16.97
31 minutes -
DR Congo Ebola outbreak surges past 6000 cases as death toll nears 3000Â
39 minutes -
Telecel Ghana CEO urges mining industry to build agile people for tech-driven future
41 minutes -
Ghana Digital Centres’ loss nearly triples to GH¢6.06m as revenue falls
42 minutes -
The private school teacher crisis: A silent exodus
44 minutes -
NPC Ghana congratulates Farida Iddriss on Africa Aquatics Zone II leadership role
44 minutes -
Zanetor pledges to protect Ghana’s natural resources for future generations
46 minutes -
2024 defeat was due to demoralised base, poor preparation – Boakye Agyarko
50 minutes -
Ghana welcomes UN report backing reparations for transatlantic slavery
52 minutes -
Fidelity Bank convenes debt capital markets conference to turn Ghana’s recovery into long-term growth
53 minutes -
RTI Commission marks 2026 RTI month with focus on information integrity in digital age
54 minutes -
GoldBod now owns all the risk: What the Bank of Ghana’s exit from the Gold Programme really means
59 minutes