Audio By Carbonatix
Energy Minister Matthew Opoku Prempeh says Ghanaians should brace themselves for systematic nationwide power outages in May.
During a press briefing Thursday to discuss the country's power supply, the Energy Minister disclosed that due to ongoing works on the Pokuase and Kasoa substations, the coming month would see an increase in shortage of power supply.
Although power supply providers such as Ghana Grid Company Limited (GRIDCo) and the Electricity Company of Ghana (ECG) say there is no specific timetable for power outages, Mr Opoku Prempeh indicated that in May, power outages would be well ordered and planned.
"Just two days ago, I received a letter from the Millennium Development Authority (MiDA) who are helping to upgrade the Pokwase and Kasoa substations just two days ago, informing me that the progress of the substation is such that in the month of May, around my birthday, there is going to be systematic power outages," he said.

In view of this, Matthew Opoku Prempeh noted that GRIDCo and ECG would be brought to the discussion table to enable them "communicate to the people who will be affected way before it happens."
For the past two months, Ghanaians have expressed worry about the country heading back to the days of "dumsor."
But the Ministry of Energy has stated that the present challenges facing the energy sector would be resolved after present transmission lines are upgraded to resolve the issue of congestion.
In a press statement dated on Sunday, GRIDCo attributed Saturday evening’s power outage to the falling of a conductor on the Tema-Accra East transmission line at Trasacco.
Referencing the GRIDCo statement, the Energy Minister entreated all power supply providers to continuously update Ghanaians on recent developments to enable them to plan their daily activities smoothly.
"Ladies and gentlemen, the power system involves machines and equipment as a result, maintenance processes are scheduled in order for the machines not to break down.
"However, there are occasions where the systems experience unplanned faults which results in outages that last a while before restoration.
"It is only appropriate that managers of the power systems of Ghana communicate such reasons timeously to the public in order for people to plan their lives accordingly," he said.
Latest Stories
-
Academic City named Ghana’s leading innovation-driven university
2 minutes -
Fire destroys Mercedes-Benz vehicle, 13 car doors at mechanic shop in Ho
5 minutes -
Fire destroys two container shops, damages three others at Bogoso market
13 minutes -
12 suspected illegal miners remanded after Forestry Commission swoop in Bosomtwe Forest Reserve
19 minutes -
Guinness Ghana DJ Awards unveils ‘All Out’ as theme for 2026
23 minutes -
NPP demo exposes hypocrisy over remembrance of 8 helicopter crash victims – NDC
25 minutes -
Franklin Cudjoe appointed to Ghana’s Joint National-United Nations Steering Committee
26 minutes -
South Africa plans new rules on ex-leaders’ foreign trips after Zuma’s visit to India
42 minutes -
Ga Mantse pledges support for Ghana Medical Trust Fund to improve specialised healthcare access
54 minutes -
Chamber of Mines donates GH¢2m relief items to flood victims
56 minutes -
NCCE empowers student leaders to champion integrity, accountability
57 minutes -
Ghana Medical Trust Fund donates items to support Homowo Festival
58 minutes -
Education Ministry condemns Obuasi SHTS violence, directs GES to investigate assault on headmaster
59 minutes -
Sweet scent of Ghana has gone afar: Toronto is a testament
1 hour -
Transport fares to remain unchanged as operators’ welcome gov’t fuel price intervention
1 hour