Audio By Carbonatix
Smooth production and off-take in the Jubilee field is forecast following the successful completion of the last phase of the Turret Remediation Project which began in 2016.
“The challenges with the turret have been completely resolved”, Offshore Field Manager, Bruce Tait pointed out as he took a group of journalists on a tour of the FPSO Kwame Nkrumah.
Turret damage
The FPSO Kwame Nkrumah, the floating production storage and offloading vessel, uses one of the biggest turrets ever constructed in the oil industry.
In 2016, lead operator of the Jubilee Field, Tullow Oil confirmed damage to the bearing which could no longer rotate as originally designed. Oil production and gas export continued but under revised operating and off-take procedures.
The Turret Remediation Project was to replace the bearing and ensure a safe and sustainable long-term offloading capability from the Jubilee field.

“It is indeed an industry ground-breaking innovation to be able to remediate the turret and create an efficient offloading system concurrently alongside production”, Tait indicated.
The groundbreaking work
The remediation project, the first of its type at sea required the FPSO Kwame Nkrumah to be shut down a number of times for work to stabilize the turret bearing.
In December 2018, the FPSO was successfully rotated to its new heading of 205 degrees and subsequently spread-moored.
In January this year, Tullow announced the arrival of a Catenary Anchor Leg Mooring (CALM) buoy for off-take from the FPSO. The CALM buoy is a floating hull with a rotating head to which vessels can moor.

Retrofitted on the Jubilee FPSO Kwame Nkrumah it would reduce the overall offloading costs associated with the Dynamic Positioning (DP) shuttle tankers which were previously employed to support oil off-take on the Jubilee field.
The buoy located more than 1.8 kilometers away from the FPSO was fabricated in Estonia. It is designed to complete a one million parcel oil offloading to an export trading tanker in 27 hours.
The construction and installation was supported by Belmet 7, a Ghanaian company in Takoradi.
Production performance and expertise
The FPSO Kwame Nkrumah currently produces 96,200 barrels of oil a day as challenges have been fixed.
Mr. Tait explained production at the Jubilee Field was a mix of complicated systems, touting Tullow’s technical expertise to produce and safely offload oil.
“Our ability to run these processes seamlessly, with focus on safety attests to Tullow’s operational excellence. This is something to be proud of”, he added.

Together with all other vessels in the field, the Jubilee operations have over a 1000 personnel in the field with a significant proportion being Ghanaians. This Tait said means “this operation contributes significantly to local content”.
Media capacity building
The visit to the FPSO Kwame Nkrumah concluded a three-part training for selected journalists. Tullow Ghana has committed part of its resources to build the capacity of Ghanaian journalists in reporting on oil and gas matters. The oil firm deems it crucial for the development of the oil and gas industry in Ghana.

“You read about it, you hear about it but it is different when you see it. This crystallizes everything”, Senior Communications and Investor Relations Advisor at Tullow, Yao Kuwornu remarked at the end of the tour.
Latest Stories
-
Malawians repatriated from South Africa amid xenophobia concerns
26 seconds -
Karaga MP to send top 3 players for trials abroad
2 minutes -
Five people injured in stabbing at New York City’s Penn Station
3 minutes -
Ten dead after migrant boat capsizes near Malta, Italian coastguard says
3 minutes -
AMA confirms Avenor building collapse had no valid permit
20 minutes -
Report illegal dumping, earn GH¢200 — Accra Mayor launches reward scheme
22 minutes -
Victory Bible Church marks 41st anniversary with blood donation drive, medical equipment support
30 minutes -
Avenor building collapse death toll rises to three — Accra Mayor
33 minutes -
Gov’t has no clear flood strategy for Accra — Miracles Aboagye
40 minutes -
Avenor collapse: Engineer calls for strict construction site inspections by assemblies
47 minutes -
Young climate advocates blame attitudes, weak enforcement for Ghana’s recurring flood crisis
54 minutes -
School of Thoughts Ghana empowers Upper West students with AI, leadership, and market-ready skills
1 hour -
Wa East MP injects GH¢100,000 into road programme to boost infrastructure works
1 hour -
Ayine, Afenyo-Markin to headline African Governance and Anti-Corruption Summit in Accra
1 hour -
Sissala East MP secures 15 new telecom sites to improve network coverage
1 hour