Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
Samini thrills fans at the 2025 Samini Xperience concert
3 minutes -
Ghana EXIM Bank repositioned to reduce import bill on rice, poultry – CEO assures
8 minutes -
Photos: Hundreds turn out for Joy FM’s 2025 family party in the park
47 minutes -
Volta Regional House of Chiefs renew call on Immigration to remove inland barriers at Sogakope, Asikuma
56 minutes -
Police Christmas special operation: 27 suspects rounded up in Savannah Region
1 hour -
Seven hospitalised after gunshots disrupt jummah prayers in Ho
1 hour -
70 mothers receive Christmas hampers from MTN after delivering at KATH
1 hour -
Let’s prove our readiness power through deeds, not words – Afenyo-Markin to NPP faithful
2 hours -
Stonebwoy brings the house down at BHIM Festival 2025
2 hours -
Development flourishes where peace and cooperation prevail – Roads Minister
2 hours -
Children enjoy a day of fun and laughter at Joy FM’s Party in the Park 2025
2 hours -
Joy FM Party in the Park 2025: Shakers Royal Band ignites excitement
2 hours -
MTN Ghana hands over hampers to 25 newly born ‘bronya’ babies at Cape Coast Hospital
3 hours -
Kwanpa Band thrills patrons as Joy FM Family Party in the Park
3 hours -
Lawyer arraigned over alleged GH¢800k excavator fraud
3 hours
