Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
Ofankor–Nsawam Road: Roads Ministry announces new diversion for asphalt works
18 minutes -
ECOWAS deploys standby force to Benin amid military takeover
29 minutes -
Livestream: The Probe discusses scholarship debt crises
33 minutes -
2025/26 GPL: Hearts suffer comprehensive 2-0 loss to Karela United
1 hour -
Kennedy Agyapong begins Central Regional campaign tour with major healthcare donations
1 hour -
Digital-savvy youth in Northern Ghana use internet to digitise local languages for generations
2 hours -
GES directs Dzodze-Penyi SHS Headmaster to step aside over alleged sexual misconduct
2 hours -
My vision is to build an agile central bank ready for emerging risks; tackling dollarisation is also a major priority – Asiama
2 hours -
Ukrainian city hit by ‘massive’ strike as peace talks in US conclude
2 hours -
Staff and tourists among 25 killed in Goa nightclub fire
3 hours -
BoG to cut policy rate aggressively in coming months – Fitch Solutions
3 hours -
GPL 2025/2026: Salim Adams sends Medeama top of the league
3 hours -
CUTS raises concern over prolonged delay in consumer protection and competition law passage
3 hours -
Dumelo urges youth to embrace agriculture, entrepreneurship at VYE Forum
3 hours -
GPL 2025/26: Oduro’s stunning strike earns Hohoe United win over Asante Kotoko
3 hours
