Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
Fire ravages shops at Kwame Nkrumah Circle as fighters battle to contain flames
1 hour -
Joy FM’s 90’s Jam is underway at Pleasant Gardens with massive crowds and retro vibes
2 hours -
Former MMDCEs appeal to President Mahama over delayed end-of-service benefits
3 hours -
TTAG raises alarm over delayed recruitment of trained teachers
4 hours -
Five critically injured after pickup truck rams into traders at Baah Yard
4 hours -
January 9 declared public holiday
5 hours -
GLICO General petitions Mahama over insurance industry concerns
5 hours -
2025/26 GPL: Safianu Usman’s missed penalty denies Hohoe United victory in Volta derby stalemate
5 hours -
MDF reiterates commitment to ensure sustainable dev’t in mining communities in 2026
5 hours -
Jospong Group partners Ghanaian scholars in diaspora to drive national development
6 hours -
Newsfile to discuss over $214m loss in Gold-for-Reserves and galamsey fight under Mahama
6 hours -
The Silence of the doer: Why strategic storytelling is the soul of governance
6 hours -
Police nabs 3 drug suspects in Tamale
6 hours -
The surprising benefits of a glass of orange juice
6 hours -
31 remanded over invasion of Apamprama Forest Reserve
7 hours
