Audio By Carbonatix
The Ghana Grid Company Limited (GRIDCo) has reported the Electricity Company of Ghana (ECG) to the Energy Minister for failing to issue a load-shedding timetable for customers during the ongoing power outages, commonly referred to as "dumsor."
GRIDCo says that the National System Control Centre (NSCC) has requested ECG to provide a timetable due to the unavailability of the maximum grid capacity and warns that ECG's reluctance to comply with this request poses a significant risk to the stability of the national grid.
In a petition submitted to the Minister on Thursday, March 28, GRIDCo highlights the potential consequences of ECG's actions, warning of possible disruptions in power supply for customers.
“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:
- Avoidable power outages for customers
- System collapse
“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering."
Read also: Dumsor: Accept that you’ve mismanaged the energy sector – Mahama to government
GRIDCo also clarified that accusations levelled against it for emergency disconnections do not accurately represent the present circumstances.
The company emphasised that ECG's failure to adhere to load management instructions constitutes a violation of regulations, and as such, GRIDCo should not be held responsible for matters beyond its jurisdiction.
“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”
Consequently, GRIDCo is calling upon the Minister to intervene and ensure that ECG adheres to the issuance of a load-shedding timetable.
“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations," the petition said.
Latest Stories
-
Live stream: Newsfile digs into E&P’s takeover of Damang Mines, OSP powers and Anti-LGBTQ Bill
5 minutes -
Moody’s maintains Ghana’s rating at Caa1, revises outlook to positive
41 minutes -
Zambia elevates tourism education to national priority as President Hichilema backs continental summit
2 hours -
Activa promotes credit insurance to boost SME export growth
2 hours -
ILTM Africa 2026 opens doors to inbound and outbound luxury travel in Cape TownÂ
2 hours -
“BP Soul Travel and Tours scored the highest marks” – Sports Minister Kofi Adams endorses agency for World Cup travel
2 hours -
‘At the age of 12, I was teaching people and collecting money from them’ – Forty Under 40 Awards
3 hours -
I broke my virginity at the age of 26 after university – Richard Abbey Jnr.
4 hours -
Sacked for fees, saved by faith: The untold story of Forty Under 40 Awards founder Richard Abbey Jnr
4 hours -
GCB Bank surges GH¢0.45, ETI gains GH¢0.06 as GSE ends week higher
5 hours -
Two teens jailed 55 years for robbery
5 hours -
UDS demands apology for MPhil student wrongly branded as Tamale robber
6 hours -
“We don’t sell fish!” – Tema Shipyard CEO hits back over dead fish discovery
7 hours -
Sam George defends anti-LGBTQ+ Bill as ‘national priority’ amid debate over gov’t focus
7 hours -
Artemis II astronauts safely back on Earth after trip around moon
7 hours