The 2024 Presidential Candidate of the National Democratic Congress (NDC), John Dramani Mahama, has told President Akufo-Addo that it is not within his powers to determine who succeeds him as he prepares to exit office.
The former President reminded the outgoing President that the greatest legacy he owes Ghanaians is to superintend over a peaceful and credible elections.
Mr John Dramani Mahama was speaking at a ceremony in Damongo in the Savannah Region, where he cut sod for the construction of a new multipurpose Ndewura Jakpa palace.
The project, which is being financed by the former President, is of Malian architectural designs and comprises a palace, a residence, and a meeting area.
Although the President, Nana Akufo-Addo was present during the ceremony, he had left the scene before Mr Mahama made the comments directed at him.
“I wish to urge our president; this was my message to Nana Akufo-Addo, unfortunately he has left, and he has left only our member of the council of state on the high table.
“I wish to urge our President that the best legacy he can leave this country, is to superintend over a peaceful, transparent and credible election.”
I wish to remind him, that it is God who makes rulers and he can never ever be the one to choose his successor. It is God who will choose his successor “he stated.
The former President said Ghana continues to remain as a beacon of democracy in Africa, and therefore it behooves the President to do the needful to protect that image.
He condemned the violent incident recorded during the 2020 election where some eight Ghanaians lost their lives after they were allegedly shot by some security personnel.
Mr Mahama particularly expressed surprise that the state has not taken steps to fully probe the matter, punish the perpetrators and adequately compensate the families of the victims.
He promised that if the NDC returns to power after the 2024 election, the families of the victims would be duly compensated.
The new multipurpose Ndewura Jakpa palace project, which has Architect Atibila as the consultant and Grandeza Construction Company Limited as the builders, is expected to be completed in October 2024.
Latest Stories
-
CalBank appoints Johnson Oware as Deputy MD
4 hours -
CRO Evans Teye Agbozo is new head of Kumasi collection of GRA-Customs Division
4 hours -
Akosombo Dam safe, no cause for alarm – GNFS assures
4 hours -
Dozens displaced in fire outbreak at Nima-Moke in Ashanti Region
4 hours -
Principal of St. Vincent College of Education resigns amid tensions over leadership disputes
4 hours -
Crystal Chapter of Full Gospel Business Men’s Fellowship inducts new executives
5 hours -
Memorable performances during ‘Sound of Christmas’ by SCLAN Music Foundation in the UK
5 hours -
Energy breakthrough: How floating power units can change Ghana
6 hours -
How to deliver category management: A strategic guide for procurement and supply chain experts in Ghana
6 hours -
Lessons in transitioning social media accounts and digital infrastructure between old and new governments: Insights from Ghana and the US
6 hours -
Fire outbreak reported near Akosombo Dam
7 hours -
EC demands arrest, prosecution of perpetrators of Ablekuma North violence
7 hours -
Police restore calm in Nkwanta after disturbance
7 hours -
Mahama appoints Victoria Emeafa Hardcastle as Ag. CEO of Petroleum Commission
8 hours -
Office of Alan Kyerematen dismisses “fake appointment letter” from Mahama
8 hours