Audio By Carbonatix
The Majority Leader, Mahama Ayariga, and the Transport Minister, Joseph Bukari Nikpe, have both confirmed that Kotoka International Airport will be renamed Accra International Airport.
The name, which has been in place for about 57 years, would be reverted to the airport’s original designation.
What has received far less attention is the cost of such a change.
In cities and countries where airport names have been changed, the process is typically accompanied by a detailed, publicly disclosed budget.
This is often presented separately by city authorities, parliament, and the airport operator.
The aim is to provide a clear breakdown of costs, funding sources, and to ensure that passengers are not indirectly charged through higher airport service fees to finance the exercise.
Local advertising and branding experts in Accra estimate that renaming Kotoka International Airport could cost between $2 million and $5 million.
As the former executive director of the Advertising Association of Ghana, Frank Dadzie put it, "we're looking at between $2 million to $5 million dollars to be able to effectively do this. But we also have to bear in mind that it might not be a full-scale rebranding, but a name change."
That estimate is broadly consistent with international experience.
Historical records show airport renaming costs ranging from about $850,000 in 2001 to as much as $7 million in 2021, depending on airport size, traffic volumes, and the scope of rebranding.



The main cost components would include replacing the primary terminal signage, updating road and directional signs leading to the airport, changing logos and branding, rebranding materials used by airlines and for international passengers, and updating stationery and business materials.

Ordinarily, changes to ICAO and IATA airport codes can add to costs. However, Ghana’s current codes do not include the name Kotoka, meaning they can be retained.
This would limit part of the potential expense.
Parliament and the Ghana Airports Company Limited will need to provide the public with a detailed cost breakdown of the renaming exercise.
They will also need to disclose the source of funding.
Transparency will be critical to ensure that the financial burden is not quietly passed on to passengers or absorbed through higher airport charges.
Latest Stories
-
Sophia Akuffo didn’t resign over Torkornoo’s removal – Kwakye Ofosu
46 minutes -
Government ends diesel fuel relief ahead of June pricing window
52 minutes -
Bossman Asare resigned voluntarily, government didn’t pressure him – Kwakye Ofosu
55 minutes -
Military deployed to Bawku SHS after student rampage over exam malpractice crackdown
58 minutes -
Roads Ministry must disclose full details of road contracts – MFWA
1 hour -
Two jailed over armed robbery attack on New Edubiase fuel station
1 hour -
IAEA backs Ghana’s nuclear readiness amid Africa’s growing energy transition
1 hour -
Tema West MP demands urgent probe into missing Constituency Women’s Organiser
1 hour -
Church of Pentecost Chairman calls on Nkwanta residents to embrace peace
1 hour -
Mahama presides over 48th Change of Guards Parade at the Presidency
1 hour -
Mahama receives letters of credence from seven new envoys
1 hour -
IAEA, FAO targets Striga threat to legume production in Africa
1 hour -
Africa must turn gas wealth into prosperity – Leaders declare
1 hour -
Ghana positions itself as preferred outsourcing hub at London roundtable
1 hour -
Police arrest suspect in murder of UCC student Innocentia Avinu
2 hours