Audio By Carbonatix
The Volta floods have become a nationwide catastrophe, displacing over 26,000 people due to the decision by the Volta River Authority (VRA), to release excess water from the Akosombo and Kpong dams.
Intense rainfall has caused a massive influx of water into these dams. Areas near the Bui dam, sourced from the Black Volta, have also been severely affected.
Nine districts along the river and downstream of the lake have all been impacted. Seven districts downstream, including Tongu areas, Asuogyaman, Anlo, and Ada East, have witnessed significant flooding. Mepe, a town in the North Tongu district, has been submerged, forcing its residents to evacuate.
Watch full analysis
The last time such a disaster happened as a result of the spillage was in 2010 - that’s 13 years ago. According to the Volta River Authority, the dam has a maximum operating level of 277.5 feet, and spillage is necessary to prevent compromising the dam's integrity.
When the spillage began a month ago, the water level was approximately 272.5 feet.
Despite 30 days of continuous spillage, this figure has risen to slightly over 277.3 feet.
In recent days, the rate of water level increase has slowed down, but the VRA has stated its intention to continue the discharge until a satisfactory level is achieved.
Latest Stories
-
SIGA rejects claims of steering SOE insurance to SIC
1 hour -
Explosions at Burundi ammunition depot kill civilians, witnesses say
1 hour -
Wulugu embraces clean energy as residents move away from traditional cooking methods
1 hour -
‘Everyone wants to act like a doctor’ – Francis Abu reacts to World Cup doubts after injury
1 hour -
Hohoe United announces withdrawal from Ghana Premier League
1 hour -
GhIE inducts 194 professional engineers, calls for higher standards in infrastructure delivery
2 hours -
Government reiterates commitment to growth in real estate sector; Prime Accra launched
2 hours -
Energy Minister engages key stakeholders to boost Ghana’s upstream petroleum sector
2 hours -
Flood survivors in North East region demand non-partisan action on Pwalugu Dam Project
2 hours -
“We’re not speaking out of vacuum” – IMANI defends SIC political inference claims
2 hours -
GH¢20m unexecuted hospital payment exposes systemic failure in public spending – Edem Senanu
2 hours -
Sampson Tagbor: SIGA’s B2B strategy is proactive and must be commended
2 hours -
All set for 2026 Kwahu Business Forum
3 hours -
Photos: Mahama welcomes Zimbabwean President Mnangagwa for 3-day state visit
3 hours -
Four killed in bus crash at Sefwi Asempanaye
3 hours
