Audio By Carbonatix
Communications and Digitalisation Minister Ursula Owusu-Ekuful was in the middle of an address to the press when the unexpected happened.
The agenda was mostly to throw light on the new initiative that she says aims to deliver affordable 5G mobile broadband services across Ghana.
The Ministry would also subsequently respond to suspicions regarding how the company awarded the 5G network rollout contract was established just one week before receiving the contract.
At the event on Thursday, May 30, Mrs Owusu-Ekuful explained that the company was specifically created for this purpose because there was no existing neutral infrastructure company capable of handling the rollout at that time.
She said the new special purpose vehicle, Next-Gen InfraCo (NGIC) was a collaboration between government and Ascend Digital, K-NET, Radisys, Nokia, and Tech Mahindra, supported by All Mobile Network Operators in Ghana, starting with AT and Telecel.
But while she was explaining the rationale behind the new partnership, the electricity went off.
‘Dumsor’ interrupts Ursula Owusu-Ekuful mid-speech during her press conference at the Information Ministry this morning. pic.twitter.com/WpuwxMCt51
— Kenneth Awotwe Darko (@TheKennethDarko) May 30, 2024
Lights, microphones, and speakers were all cut off, plunging the Information Ministry’s conference room into darkness.
The outage lasted for about five minutes.
After the power was restored, the Minister apologised for the hitch and continued with her address.
The unstable nature of the power supply over the past few months has been a matter of concern for many Ghanaians.
Some celebrities, including actress Yvonne Nelson, have planned a demonstration against the situation, which has left residents and businesses in a terrible predicament."
On April 18, 2024, a group calling itself 'Youth for Asanteman' staged a demonstration in Kumasi to demand a load-shedding timetable amid recent unannounced power cuts.
Clad in red and black, the protesters prevailed on the Electricity Company of Ghana (ECG) and the Energy Ministry to ensure stable power supply.
The protest was staged after President Akufo-Addo commissioned the Kumasi 1 Thermal Power Plant aimed at improving access to power.
Latest Stories
-
UK summons air traffic boss after major outage as flights slowly resume
5 minutes -
Ghana Sports Fund plans pension scheme for retired athletes
5 minutes -
Cyril Hadzi announces new record after growing worship music catalogue
14 minutes -
Daily Insight for CEOs: Managing costs without weakening the business.
37 minutes -
Weija Dam spillage determined by water inflows, not fixed schedule – GWL
45 minutes -
Ghana’s economy grows 6.0% in Q2 2026, first-half growth hits 6.2% – GSS
52 minutes -
GPL 2026/27: Kotoko, Debibi United face GFA charges after opening-day draw
53 minutes -
Apple expected to unveil first folding phone, with new CEO Ternus in command
54 minutes -
Weija Dam: GWL says plans are in place to desilt reservoir when necessary
1 hour -
Weija Dam spillage necessary to prevent dam collapse – GWL
1 hour -
FDA warns public over falsified Dr Alfred Capsules adulterated with sildenafil
1 hour -
Afenyo-Markin demands urgent national dialogue over Ghana’s education challenges
1 hour -
Iran and US hit tankers in biggest wave of attacks on shipping since war began
1 hour -
Frustrated parents camp at GNAT hall as CSSPS resolution exercise enters day 3
1 hour -
AFCON 2027Q: Accra Sports Stadium is ‘only approved’ venue – GFA
1 hour