
Audio By Carbonatix
The Management of Ghana Water Ltd. (GWL), Accra West Region, has announced an emergency shutdown of the Weija Treatment Plant to allow for urgent repair works.
A statement issued by the GWL noted that the shutdown will take place on Tuesday, 18th November 2025, from 12:00 p.m. to 6:00 p.m., during which water supply to several parts of Accra will be temporarily interrupted.
Areas expected to be affected include Korle-Bu, Dansoman, Mamprobi, parts of Weija, Gbawe, Mallam, Anyaa, Kwashieman, Ablekuma, Darkuman, and Kaneshie.
The others are Tesano, Odorkor, Sowutuom, Lapaz, Achimota, North Industrial Area, and surrounding communities.
GWL noted that "Our engineers are on-site, working hard to ensure that the work is completed on schedule. We regret the inconvenience caused."
Read also: GWL disconnects Standard Water, others in crackdownon illegal connections in Kasoa

Latest Stories
-
Understanding human rights, refugees, statelessness, and asylum: Why these issues matter to us all
3 minutes -
Fresh twist in Abu Trica case as court sets July 9 hearing over extradition stay
4 minutes -
Accra: A city built to drown – A practical blueprint for ending Accra’s urban floods
6 minutes -
I voted for NDC; I like everything about Mahama – Kumchacha
7 minutes -
Drowning by Design: How Accra chose its floods
10 minutes -
Agnes Afua Oforiwa Opoku
11 minutes -
Belgian federation to challenge FIFA’s decision to let Folarin Balogun play in World Cup match
14 minutes -
Russia’s missile and drone attack on Ukraine kills at least 18 ahead of NATO summit
19 minutes -
Court adjourns GH¢30m EXIM Bank fraud case involving Chairman Wontumi over plea bargain talks
20 minutes -
Floods: Demolish illegal structures on waterways regardless of political cost – Elikem Kotoko
21 minutes -
Carlos Queiroz departure exposes deeper structural cracks within Black Stars
22 minutes -
Cities remember too: Why Accra floods and how continuity could prevent it
23 minutes -
JICA reaffirms support for Ghana’s 24-Hour Economy and industrial transformation
30 minutes -
EOCO warns of emerging ‘Model Q’ criminal network driving trafficking and financial fraud across West Africa
34 minutes -
Students Loan Trust Fund urges applicants to complete loan process before July 15
42 minutes