Audio By Carbonatix
A building collapse that killed 34 construction workers and injured dozens in Western Cape province last year was "entirely preventable", South Africa's government says.
A new report into the tragedy reveals that serious safety concerns had been raised well before the partially built five-storey apartment block collapsed in the town of George in May 2024.
Public Works Minister Dean Macpherson said the collapse was the result of multiple failures, including the use of substandard materials, structural cracks, and visible gaps.
"There were a number of red flags that were continually raised about this project," said a visibly angry Macpherson.
Some of the defects were detected a year before the collapse. The health and safety officer even resigned in protest, but work continued, the report found.
"The work should have stopped," Macpherson said.
He added that these signs were a chance to turn back, but instead, problems with the building were "covered up".
Workers reported feeling vibrations in the structure and being told to cover up holes with sand and substandard concrete, the report revealed.
Following what the minister described as an "emotional and painful" private meeting with survivors and families of victims, he called for criminal accountability for those found to have been negligent.
A police investigation is under way but no arrests have been made.
Many survivors are still facing trauma, medical bills and struggling to put food on the table, Macpherson said.
Electrician Delvin Safers was pinned under the tonnes of concrete and mangled metal for 28 hours. He sent voice notes to his family, believing he might die.
A colleague of his was killed instantly as the concrete fell on top of them.
After his rescue, Mr Safers told the BBC he had noticed no warning signs, but believed that if shortcuts were taken during construction, then those responsible "should be held accountable".
He did not attend the minister's briefing, but his father, Deon, who did, told the BBC that he was impressed by the report.
"We want justice," he said, adding that his son had received no compensation
Another survivor of the disaster, Elelwani, tearfully told local media that her life had changed in the last year.
She lost many teeth, struggles to eat and has been the subject of bullying. She appealed for money from well-wishers.
Macpherson pledged to introduce regulations to improve oversight in construction and reform outdated legislation.
The probe was conducted by the Council for the Built Environment and a parallel investigation by the Engineering Council of South Africa.
Latest Stories
-
Kofi Jumah reportedly hospitalised as GH¢55m bail conditions remain unmet
2 minutes -
‘Behind the Lens with Queen Liz’ explores concepts of heaven and jannah
11 minutes -
Quality Insurance marks 30 years with push for women-focused innovation, trust-building
16 minutes -
Ghana’s Ambassador to Libya commends CEO of Afro Arab Group
16 minutes -
Nkwanta crisis: Fresh gunfire sends residents fleeing; 26-year-old rider shot
17 minutes -
Two BECE candidates killed in motor crash en route to Exam in Upper West
17 minutes -
PSG, Manchester United lead race for FC Nordsjaelland star Prince Amoako Jnr
19 minutes -
Lawra MP urges BECE candidates to avoid malpractice, assures support
22 minutes -
Korle Bu laboratory scientists demand retraction from doctors over ‘false’ claims
38 minutes -
NHIA waives NHIS fees and waiting period under new ‘STORM’ initiative
41 minutes -
GTDC CEO Prof. Kobby Mensah named among top 12 global leaders shaping place branding
41 minutes -
Large accounting losses, but is the Bank of Ghana truly policy solvent?
43 minutes -
The Bank of Ghana is winning the inflation war, but who will pay the hospital bill?
48 minutes -
BECE candidates stranded as Nyankrom residents block roads over ‘death trap’ network
48 minutes -
Walking on One Leg of the Tripod: The IMF endgame in Ghana
49 minutes