Audio By Carbonatix
North Tongu MP Samuel Okudzeto Ablakwa has released documents insisting that the original value of the planned new head office for the Bank of Ghana was about US$82m instead of the US$250m being quoted now by officials of the bank.
In a Facebook post on Thursday, August 17, Mr Ablakwa revealed among others that the initial procurement processes for the new head office actually started.

Per the documents, the processes for the project commenced in 2020 contrary to other reports that it started under the erstwhile John Mahama government.

Mr Ablakwa in the said post listed 26 points addressing the corporate governance issues including tendering and procurement discrepancies, the companies contracted on the project and other issues of public concern.

The controversial project which is currently costed at US$250 million, has attracted a lot of reactions since the apex bank confirmed that it was indeed building a new head office. Critics say it is one of the last things to consider for any institution reporting huge losses and negative equity.

The BoG in response to a press statement said the new office complex was necessary principally for security and other reasons, stressing that the current location was not safe in the case of an earthquake.

Already, the Minority have demanded the resignation of the BoG Governor and his deputies with a 21-day ultimatum which has only 12 days remaining.
Latest Stories
-
Tamale Water Project to help address northern Ghana’s water shortages – Ghana Water Limited
25 seconds -
Oil prices fall and stocks rise after Trump says Iran war ‘very complete’
7 minutes -
Ghana-Peru Relations: Foreign Ministry outdoors new book focusing on a Journey of Friendship and Cooperation
10 minutes -
Kufuor advocates strict separation of powers to strengthen Ghana’s democracy
11 minutes -
Well-structured governance institutions improve efficiency and strengthen democracy – Kufuor
14 minutes -
Two Turkish firms to construct water treatment plant for Eastern Accra
18 minutes -
Rising sophistication in science and technology is deepening corruption – Kufuor
32 minutes -
Allegations of product hoarding by OMCs are baseless – CBOD
36 minutes -
Council of State not enough to check executive – Kufuor
37 minutes -
CLOGSAG strike without production: Ghana’s dangerous culture of entitlement
40 minutes -
Achimota School raises infrastructure concerns as surging demand outpaces facilities
41 minutes -
Ghana’s economic challenges fuel corruption, private sector must grow – Kufuor
43 minutes -
Five Iranian footballers granted Australian visas after anthem protest
45 minutes -
Kufuor calls for higher pay for public servants to curb corruption
53 minutes -
Kufuor calls for stronger separation of powers, greater parliamentary control over national budget
1 hour
