Parliament's Ranking Member on the Education Committee, Peter Nortsu-Kotoe, has called for equitable distribution of the Ghana Education Trust Fund (GetFund) projects in schools to ensure fairness.
He said the disparities in the distribution of infrastructure projects, especially in Senior High Schools (SHS), was not the best and must be looked at again.
According to the Ranking Member, who is also the Member of Parliament (MP) for Akatsi North, wondered if the infrastructure provision was based on needs assessment.
"I am not sure some schools will deliberately present only two projects as needs assessment when others are getting over 10 projects," he said.
Speaking to the media after the Education Committee of Parliament paid a working visit to GetFund projects in the Eastern Region, he said equity in infrastructure distribution was key to accessible and quality education.
He cited Ofori Panin Senior High School in the Abuakwa North Municipality, for instance, which as part of the visit, was found to have about 10 construction projects funded by the GetFund under the Free Senior High School Emergency Intervention Projects ongoing.
He said why one school would be given so much at the expense of others facing the same challenges beat imagination.
The Chairman of the Parliament Education committee, Mr Kwabena Amankwah Asiamah and MP for Fanteakwa North, on his part, said the team was impressed with the progress of work in the five schools visited, including the construction of a new model SHS at Abomosu in the Atiwa West District.
He said the projects attested to the fact that the government was committed to developing the educational sector to provide accessible and quality education to Ghanaians.
However, he noted, that the construction of a 12-unit boys dormitory at Oyoko Methodist SHS and a 12-unit dormitory at the Ofori Panin SHS were not up to standard and emphasized that the committee would recommend to GetFund to ensure that the right thing was done.
According to the Chairman, the work output and finishing by the contractor at those two schools was far below standard and did not give value to the money invested in the project.
The team visited the 71-million cedi Abomosu SHS complex which began in November 2020 and comprises a 1,200 seater capacity assembly hall, 1,500 capacity dormitory for girls and 1,000 capacity for boys, 36-unit classroom block, and 12-unit teachers quarters, among others, which is 90 per cent complete.
They also visited Ofori-Panin where they inspected three dormitories, teachers bungalows, classroom blocks and renovation of several infrastructures, the Oyoko Methodist SHS where they inspected 12-unit boys dormitory, a 12-unit classroom block and toilet facilities and Ghana Secondary School (Ghanass), where they inspected the ongoing construction of dormitory and classroom blocks.
Latest Stories
-
We have to focus on Premier League now – Jurgen Klopp
4 mins -
Oil price rises as US says Israel has struck Iran
10 mins -
MPs open up about growing financial pressures and health challenges
15 mins -
Nigerian music star Simi talks charting her path to stardom, and why she still engineers her own music
18 mins -
You’ve got no power to impose fines on us – ECG board members to PURC
32 mins -
Ghana to host Ghana-Cote d’Ivoire Cocoa Initiative Headquarters
42 mins -
Olympism365: IOC, WHO and PATH hold stakeholder engagement in Ghana
44 mins -
War can devastate nation, let’s be thankful for the peace we have – Kofi Sarpong
52 mins -
Ghanaian athletes in Côte D’voire for U-20 Championship
1 hour -
Made in Taadi must happen this year by hook or crook – Kofi Kinaata
1 hour -
Labour unions contemplate May 2 strike over unpaid Tier-2 pension dues
1 hour -
Sedina Tamakloe’s arrest: MoF, MASLOC board can’t be left off the hook – Analyst
2 hours -
Three JHS boys arrested for allegedly gang-defiling 15-year-old colleague
2 hours -
Today’s front pages: Friday, April 19, 2024
2 hours -
Magnus RexDanquah : ‘Breaking the Eight’ – The Greatest Scam Ever since Ackah Blay Miezah’s Gold Deposits claim
2 hours